The fusion design value creation of the third design management competition of China Construction Eighth Bureau was held

Author:Shenzhen Evening News Time:2022.09.29

On September 27, the third design and management contest of the China Construction Eighth Bureau ended at the main venue of Shanghai. For a total of 2 days in this competition, 29 teams from 17 second -level units competed on the same stage. The number of participants was more than 200. The competitions were wonderful and fruitful.

In response to the national epidemic prevention and control requirements, the competition was held in the form of online video conferences. The main venue was located in Shanghai. The China Construction Eighth Bureau Design Management Competition is held once a year. Compared with the previous session, this year, the actual project is the carrier, which emphasizes the ability of combat. The competition invited the leaders and experts within the bureau as a guest guest, and the competition scale and professional standards have improved.

▲ Effects of the participation plan

The concept of the "fusion design value creation" of this contest has set up two events of construction plan competitions and advanced integrated planning competitions. Wang Lei, president of the General Institute of Design and Management of the China Construction Eighth Bureau, pointed out that the excellent plan works of the construction plan will help front -end marketing, strengthen the linkage of "design+marketing", and further enhance the ability of "connecting EPC and EPC"; Through the deep integration of design, business, procurement, and construction, it fully demonstrates the concept of EPC value engineering. It aims to create the best cost -effective building products and further enhance the EPC management capabilities of China Eighth Bureau.

▲ Effects of the participation plan

The chief engineer of the China Construction Eighth Bureau has emphasized that in the face of the new situation in my country's construction market, the global situation must adhere to the EPC management concept of "integrating design, leading linkage, based on the main business, and value creation" Opportunities, explore new ideas, discover new kinetic energy, cultivate first -class design management capabilities in China, build the "eight bureaus design" as a well -known design brand in the field of engineering general contracting, and activate new engines for enterprise development.

▲ Effects of the participation plan

As a leading company in China Construction and the industry leading enterprises, the Eighth Bureau of China Construction is known for its establishment of a "high, large, fine, pointed, and new" project, and a large number of landmark buildings have been built at home and abroad. In recent years, with the increase of the EPC project and the continuous increase in design demand, the China Construction Eighth Bureau has continued to strengthen and improve the design system, and gradually cultivate and develop the EPC project design and management capabilities.

Shenzhen Evening News reporter Du Ting correspondent Pei Guannan

- END -

Atlas | These "two -way go" on these anti -epidemic roads are really warm!

Guiyang.com · Jiaxiu News from the day to night, on the one hand, an epidemic pre...

Xi'an High -tech Zone Silk Road Software City 3 roads officially opened to traffic to relieve traffic congestion

Recently, the latest three roads completed in the Silk Road Software City of Xi'an...