The construction of the main bridge of the Yellow River Bridge of the Xin Expressway Bridge is completed
Author:Heze Daily Time:2022.09.27
On September 26, the construction site of the Yellow River Bridge of the Xinxin Expressway was pouring concrete operations for continuous box beams.It is understood that since the project team launched the "Corporation of Capital for 100 Days", the project has made full use of the favorable timing of the autumn temperature and less rainwater, scientifically and reasonably arrange construction, strictly control the quality and safety of the project, and quickly promote the construction of the project.At present, the construction of the main bridge of the Yellow River Bridge of the Xinxin Expressway is completed. It is expected that the dragon will be completed by the end of November.
Heze Pay Industry All Media Reporter Li Baozhu
- END -
Thanks for a letter to the anti -epidemic alliance company
Editor's note:In the face of the unusually severe and complex epidemic prevention and control situation, the Chengdu alliance company Qianfang Chinese medicine actively claimed the task of work and de...
Maximum 35 ° C!Pay attention to heatstroke prevention, there may be strong convection weather tomorrow
Wuhan City Three -day ForecastToday during the day: cloudy to sunny daysTonight: CloudyMaximum temperature: 35 ℃, minimum temperature: 29 ℃Humidity: 60-95 %, wind: southwind 3 to 4, gusts 5 to 6 lev...