zero tolerance!The construction site in Longmen County was ordered to suspend work and rectification due to poor epidemic prevention
Author:Today Huizhou.com Time:2022.09.26
On September 24, the Longmen County Housing and Urban -Rural Development Bureau conducted a special inspection of the epidemic prevention and control of the housing construction and municipal infrastructure construction projects in the area under its jurisdiction. New personnel did not conduct health monitoring and health code inspection in accordance with regulations. Participants who did not concentrate on the construction site were ordered to suspend the construction site to suspend the work and rectification as required.
According to the requirements of the "New Coronatte Viruses Pneumonia Pneumonia in Guangdong Province": Encourage each construction site to carry out all -employee nucleic acid testing once a week, high -risk jobs such as security, chefs, procurement, and participation who have not concentrated on the construction site. Building personnel implement the list management and carry out nucleic acid testing twice a week; to strengthen participants who live in a prefecture -level city (municipality in the district and county) where there are 7 days of high -risk areas, as well as the immune -related department pushed by the public security department Participating and controlling the participants (including family members), establishing ledger, incorporating list management, timely reporting to the territorial epidemic prevention and control department, and cooperating with relevant departments to classify and classify health management measures; It is necessary to strictly implement the management requirements of the gate and the "place code", and strictly follow the requirements of temperature measurement, wearing masks, scanning code inspection, itinerary verification, and real -name registration. Code personnel, as well as various types of risks such as participants who did not implement closed -loop management after (returning), entered the construction site.
At the beginning, the county housing and urban and rural construction bureaus will further strengthen the prevention and control inspection of the housing building and municipal infrastructure construction site in the area under its jurisdiction, increase publicity and guidance, urge participating units to implement the responsibility The construction site of prevention and control measures adopts a zero tolerance attitude, discovered, investigated together, and used iron -fist measures to ensure that the epidemic prevention and control measures for each housing building and municipal infrastructure construction projects were in place.
Source: Longmen County Housing and Urban -Rural Development Bureau
- END -
The three "bosses" are rare to hold hands!High -temperature heat waves continue to affect Shencheng!
01Today's weatherThe weather situation today has not changed muchSummer heatSunny ...
Xinjiang is unknown in many places!"UFO Kaiyuan"?
Recently, the topic#Xinjiang has taken the unknown light body#rushing on the hot s...