The main line of the main line of Liudian Lixian, the Dahuang High Speed Expressway, is here!

Author:Pole news Time:2022.09.25

Jimu Journalist Sun Zeyu

Recently, the Huangpi District Transportation Bureau needs to perform emergency maintenance of the main bridge expansion joint of Liudian Lijiao at the Huanghuang Expressway. The construction time is from September 27 to October 13, 2022.

During the construction period, there will be two lanes from Hankou to Huangpai. There will be traffic safety officers on the spot. The general public is requested to plan travel lines in advance to effectively avoid blockage.The construction unit will seize the construction period and strive to complete the task of repairing as soon as possible.

Crossing Huangpi vehicles can pass like this:

1. Vehicles from Shiyan, Xiangyang, Xiaogan and other directions can via the third ring road, airport one passage, airport two channels to Han 10 (Fuyin) high -speed, Wuhan around the city high -speed, Jingzhu high -speed to destination.

2. Vehicles such as Hong'an and Macheng can pass through the Third Ring Road and the Liberation Avenue.

- END -