Coordinates China | "Sky Road" expansion and transformation brightens the "crown" of the plateau
Author:China Youth Network Time:2022.09.25
In the past ten years, a series of heavy weapons and super engineering created by central enterprises have engraved new coordinates of national development from different dimensions. On September 12th, the online theme promotion of "our ten years@coordinates China" was officially launched. Over the major achievements of representative infrastructure construction and scientific and technological innovation, it shows the courage, courage and wisdom of challenging the limits and challenging the limit.
Tang Gula Station is the world's highest altitude railway station. It is the existing in the Qinghai -Tibet Railway that allows stations and important tourism stations. In 2016, the Qinghai -Tibet Railway Gra section expansion project was officially launched. What are the severe tests of railway builders in the new era in this "restricted area of life"? How will they be rejuvenated through the energy expansion and transformation of the station? Today, Xiaoxin brings you the thirteenth issue of the "coordinate China" series theme film, "China High" "Tianluyi".
Tang Gula
Tibetan "mountains on the mountains"
Herders joke
Tang Gula, reached out to grab the sky
The wind and snow here all year round
Known as "Fengxue Warehouse"
"Mountain" shape -like station building style of Tanggula Station
Standing quietly on the Qinghai -Tibet Plateau
At the foot of the snow -capped Tang Gula
Like a crown in setting on the snowy plateau
As a Qinghai -Tibet Railway, there will be a station.
And important tourist station
Passing ability of Tang Gula Station
Passenger and freight energy that directly affects the Qinghai -Tibet Railway
2016
Granden Energy Display Project of Qinghai -Tibet Railway Grand
The builders step on this snowy plateau again
Energy expansion and transformation through the station
Let the Qinghai -Tibet Railway rejuvenate
Part1
Why expansion and transformation of Tang Gula Station?
The opening of the Qinghai -Tibet Railway
Playing a powerful radiation driving role
2006 to 166
Tibet autonomous region transportation tourists have increased by 10 times
Tourism income increases 14 times
Investment investment in investment increased by 37 times
GDP has increased 3 times
Become one of the fastest economic growth in the country
With the rapid development of the economic and society of the two provinces of Tibet, Qinghai
Qinghai -Tibet Railway Gera section
The original transportation ability is already close to saturation
In order to meet the urgent needs of economic and social development in Tibet
2016
Qinghai -Tibet Railway Gera section expansion transformation project
Formally start construction
Part2
How difficult is the station expansion of the station in the "Restrictions on Life"?
Snow plateau at more than 5,000 meters above sea level
It is not easy to expand the energy expansion of the station
High -cold hypoxia, many years of frozen soil, ecological fragility
In addition to facing the three major world problems of building plateau railways, builders
It is also necessary to solve high -density construction and simultaneous operations
Long -distance organization, multi -dimensional coordination
And various limited stacked security prevention and control problems
The entire Qinghai -Tibet Line expansion and transformation of the transportation energy increase
Through two methods to achieve
The first is to add a station on the line with a relatively long range
By increasing capabilities to enhance transportation energy
The second type is the expansion of energy expansion like Tang Gula Station
This original track length is only 650 meters
After transformation, increase it to 900 meters
The length of the trains increased
The luck is also coming up
To ensure the safety continuous operation of construction
The builder implements "hard isolation" in technical measures
Realize the continuous construction of road base soil stones, bridge Han and house construction
Rail engineering, Four Electric Engineering
Construction through the daylight of the skylight
Ensure the safety of the entire construction and the safety of personnel
Face the night construction in the bad weather environment
The builder can only reinforce the resource elements
Guarantee the continuity of construction
Part3
Open a new chapter on the Snowy Plateau
August 2018
Granden Energy Expansion Project of Qinghai -Tibet Railway is completed
The total number of stations has increased from 45 to 58
Increase 5 pairs of trains, increase transportation capacity by 80%
The running time of the Gra section of the Qinghai -Tibet Railway
Compressed to about 2 hours
Greatly improved the passage of the Qinghai -Tibet Railway train
The spirit is immortal due to inheritance
Construction of central enterprises during the construction of the Qinghai -Tibet Railway
Use the light and heat of life to cast
The spirit of the Qinghai -Tibet Railway with "Challenge the Extremely Yongchuang"
Inheritance of the generation of railway builders
Opening a page of new chapters on the Snowfield Plateau
Complete the great leap again and again
- END -
Kangle County: Easy and orderly re -transportation of rental bus
In order to coordinate the prevention and control of the epidemic and transportati...