Lijin County comprehensively builds a solid barrier in the Yellow River Anlan

Author:Great Beauty Northern Song Dyn Time:2022.06.22

The governance of the big river began in Anlan; the head of Anlan was taken in the flood. A few days ago, the Shandong Yellow River River Affairs Bureau carried out large -scale practical drills. Lijin County participated in the exercise. The project adopted a large crane throwing to twist the king's rescue technology to carry out the collapse of the Genshi of the Wuzhuang control project. Through rescue drills, comprehensively test the defense capabilities of the flood, and adhere to the bottom line of water disaster defense with the mentality of "flood during the flood season, but not only the flood will not stop", and escort the ecological protection and high -quality development of the Yellow River Basin with practical actions.

74 kilometers in the Huanghe River in Lijin County, accounting for one -nineth of the length of the Yellow River channel in the province. In the Yellow River flood prevention and disaster relief work, Lijin County adheres to accurate targeting forces, and work hard in the five aspects of "responsibility, preparation, prevention, fusion, and wisdom". Bao Huanghe Anlan and the people are safe.

Persist in "responsibility" first and fully implement the responsibility for flood prevention. Lijin County compacted the various flood prevention responsibilities systems with the responsibility system of the executive head, established an efficient operating mechanism, refined the division of responsibilities of professional units, and weaving a network of confidential flood prevention responsibilities. Further improve the list of flood prevention responsibilities of the Yellow River, clarify the protection tasks of all parties of subcontracting responsibilities, and flatten the implementation of the "116+N" Yellow River flood control responsibility system in the county. Taking the implementation of the responsibility system of the flood prevention in the Yellow River as a traction, the members of the Demi River Department, the agency's defense flood function group, and the party's responsibilities of the grassroots management section, realize the "one -to -one" connecting the grassroots section, the "point -to -point" guidance work, Effectively improve the ability to deal with dyke inspection. In accordance with the principles of "one paragraph, one case", the responsibility of the responsibility of the production embankment, the leaders of the township responsibility, and the personnel on duty are strictly implemented.

Adhere to "preparing" as the bottom, with "precaution", comprehensively consolidate basic support and enhance flood resistance. Further improve the revision of various flood prevention plans, draw a flood prevention situation, compile personnel withdrawal tables, material reserve tables, and cloth prevention tables along the line, build a Yellow River flood prevention work system, and continuously consolidate the foundation of flood prevention. Based on the demand for the flooding of 5500 cubic meters per second of Defense Lijin Station, we will improve the flood prevention safety system of the Yellow River Lijin section based on the basic principles of "guarding the king". Adhere to the plan, continue to strengthen the investigation and rectification of hidden dangers, strive to discover one place and rectify one place, realize closed -loop management, promote the repair of water destruction projects and the reinforcement of the production of the beach area, and continuously enhance the defense capabilities of the beach area.

Adhere to the word "meong" as the main, comprehensively upgrade the material reserves and team capabilities. Based on the idea of ​​"a plate of flood prevention and a network of emergency", we continuously improve the "physical reserves as the mainstay and the enterprise reserve as the supplement" model, and the Yellow River River Affairs Department and the local emergency department jointly build a comprehensive emergency material warehouse. , Shared and shared; through the high standards equipped with flood control experts, high -level forging rescue teams, high -quality training business backbones, a 7 -branter dynamic rescue team was formed, responsible for the defensive rescue tasks of 7 key guidance projects, and reserved 18789 along Huang Township and Township 18789 The reserve team of a person continuously improves the team's ability to ensure the first time to invest in rescue and rescue, and build a working pattern of joint management and integration.

In terms of management model, Lijin County adheres to "wisdom" as the focus, continuously strengthens the construction of informatization, and has opened a new model of smart flood prevention. Improve the 77 places of the project's remote video surveillance system, 19 newly built along the yellow 5G video surveillance, and equipped with drones, realizing the full coverage of the actual coverage of river potential work, traverers and inspection, and engineering rescue. Comprehensively implement the "lighting" project to solve the problem of dyke inspection and engineering rescue lighting at night.

(Li Weiwei Wang Lingyu)

- END -

4 new cases of new crown pneumonia in Liaoning Province and 5 cases of non -symptoms of infection in the soil were added to Liaoning Province

At 0-24 on June 16th, 4 new cases of new crown pneumonia were added in Liaoning Pr...

ULIKE's online infringement case won the case, saying that it will always provide consumers with high -quality products

Recently, the China Magistrate Document Network revealed a Civil Judgment issued b...