The main cable of the Lingshengyang Bridge has settled the depth of the deep and middle train for 100 minutes

Author:Hubei Daily Time:2022.09.24

The picture shows the main cable shelf of Lingshengyang Bridge.Zhang Zheng Photo (People's Vision)

On the 23rd, all the main cables of the Lingyuyang Bridge of the Shenzhen -Middle Channel were set up, and this world -class project achieved a major construction node breakthrough.

The Lingyuyang Bridge is the control of the Shenzhen -Middle Channel. It is a three -span full floating system suspension bridge that spans 1666 meters. The main tower is 270 meters high.There are two main cables on Lingyuyang Bridge, each with a maximum cable of more than 100,000 tons.

The Shenzhen -Middle Channel is another major transportation project connecting the Pearl River Estuary and West Strait, which is about 24 kilometers in length. After completion, the drive from Shenzhen, Guangdong to Zhongshan will be reduced from the original 2 hours to 20 minutes.

The Hubei Daily client, paying attention to the major events of Hubei and the world, not only pushing the authoritative policies for users, fresh hot information, and practical convenience information, but also launched a series of features such as reading newspapers, newspapers, learning, online interactives.

- END -

Huayu City Happy Logistics Park: The "heat" force of project construction is not reduced

At 7 am on August 10, the reporter saw at the construction site of the coal reserv...

38+145!

At 0-24:00 on July 1, 31 provinces (autonomous regions, municipalities) and Xinjia...