The Yangtze River Channel enters the dry period in advance, and 34 waterways focus on the defense!

Author:Yangtze Cloud Time:2022.09.23

At present, the Yangtze River Countermine has entered the dry period in advance. The reporter learned from the Yangtze River Channel Bureau on the 22nd that the bureau has fully deployed the maintenance work of this year's dry period and arranged more than 130 daily maintenance work ships, 16 testing teams, and 35 dug ships (teams) to enter 34 key points in the dry period. Maintenance and dredging of the sewer.

Affected by the "flood season" and continued drought in the Yangtze River this summer, the current traffic of the Yangtze River accounted for only 40 % of the same period, and the average water level in various places was 5.7 meters. According to data, the middle and lower reaches of the Yangtze River will continue in the future of drought and rain, and there is a high probability that extreme water conditions will occur.

In order to ensure smooth channels, the Yangtze River Channel Bureau studied 15 key waterways and 19 key waterways (river sections) across the entire line of dry periods. While increasing the dredging of the channel maintenance, it will also dynamically adjust the dredging plan according to the changes in the channel, and optimize the airway adjustment of the airway in a timely manner according to the changes in the water level and the channel to ensure that the channel bidding is accurate and the water depth is sufficient. The signal command reveals timely accuracy.

In addition, the Yangtze River Channel Bureau will strengthen cooperation with departments such as maritime affairs, severely crack down on illegal vessels such as "super water", and strengthen channel information services, timely and accurately issue channel notices, improve information services in water conditions, channel scale, channel conditions, etc. Level.

The total length of more than 6,300 kilometers has become the busiest and largest "golden water channel" in the world for many years. According to the statistics of the Yangtze River Aviation Administration, in 2021, the total of 3.53 billion tons of cargo throughput was completed, a record high. From January to July this year, the Yangtze trunk line completed a cargo throughput of 2.02 billion tons. Earlier, the Yangtze River Jiujiang Waterway affected by the low water level has resumed two -way navigation, marking that all air sections in the middle and lower reaches of the Yangtze River have fully restored two -way navigation, further unblocked the Yangtze River Shipping Logistics Artery.

"Return to Hubei · Travel"

Hubei Travel Service Platform

How to use "Return to Ebao"

Click the card below

Follow the official WeChat of "Changjiang Cloud"

/>

Click on the menu bar "Return to Ebao"

Enter the service platform

Departure, destination risk, travel policy

Query

- END -

Shandong Boxing: Chengdong Street Holds the village party branch secretary collectively talks about a conversation meeting

Boxing Rong Media · Smart Boxing News In order to further enhance the performance...

Benefit Baoding citizens!Another medical project may be included in medical insurance reimbursement?National Medical Insurance Bureau response

Hebei Youth Daily (Reporter Zhang Yushuang, a trainee Fan Jie and Chu Mengyue) Rec...