Enter the Jiuzhaigou travel ring line and add convenient channels to the Qingchuan section of Guangyuan to Pingwu highway

Author:Chengdu Daily Jinguan Time:2022.09.23

The reporter learned from the Provincial Department of Transportation that at 12:00 on September 23, 2022, the S18 Line Guangyuan to Pingwu Expressway Qingchuan section was opened to traffic and put into operation. The establishment of the G8513 Jiuzhaigou to the Mianyang Expressway is the most convenient channel for the Guangyuan direction to enter the Tangjia River Scenic Area and the northern Sichuan to enter the Jiuzhaigou Tourism Ring Road. In addition, 27 kilometers of the Mianyang section of Guangyuan to Pingwu highway will also be opened to traffic during the year.

It is reported that the project starts with horse riding township in Qingchuan County, Guangyuan City, and has a riding hub to interchange with the G75 Lanzhou to Haikou Expressway Sichuan -Ganjie to Guangyuan section; ends in Mujiashan, Pingwu County, Mianyang City. Jiuzhaigou to Mianyang Expressway. The total length of the route is 90, and the total investment of the budget is 14.075 billion yuan. Set up 25794.33 meters/114 seats (including the mainline bridge of the interoperability area), 119 culverts and channels, set up 35459.5 meters/18 meters of tunnel, 1 parking area, 1 service area, 2 maintenance work areas, 6 ramp toll stations 6 places Essence The design speed is 80 km/h, and the two -way four -lane highway technical standards are constructed. The bridge and tunnel ratio is nearly 70%. The 63 kilometers of the Qingchuan section is now completed and has the conditions for traffic. The 27 kilometers of Mianyang section will be opened to traffic within the year.

Section of traffic

Guangyuan to Pingwu Expressway Qingchuan section is 63 kilometers, passing the Guangyuan Qingchuan riding, woodfish, Qiaozhuang, Le'an, Yuexi, San pot, and Qingxi.

The opening of the toll station and the service area

3 toll stations are opened. From Guangyuan to Pingwu direction, it is Qingchuan Toll Station, Le'an Toll Station and Tangjiahe Toll Station.

Affected by the adjustment of construction and planning, Qinglong Lake service areas and toll stations in Qingchuan County will not be open for the time being.

Hub conversion situation

The riding hub can be transformed with Guanggan high -speed.

Tips

1. It is planned to open 3 toll stations, all of which are equipped with export -over and export measures, all passed the measurement of heavy equipment measurement and verification, and the vehicles can go in and out of the toll station normally.

2. The refueling and charging facilities in Qinglong Lake service areas have not been opened, charging, and parking services are not open for the time being.

Chengdu Daily Jinguan Journalist Tian Ya Chen Editor He Qixie Editor Liu Yonghao Editor Liu Yonghao Picture Provincial Department of Transportation

- END -

Gift | Due to love or career, how do you choose?

There are 6 daysThe 36th Volkswagen Film Baihua AwardAwards ceremony series activi...

Some sites in Harbin Metro Line 2 and 3 continue to suspend operations

The reporter learned from the Harbin Metro Group that according to Harbin Xiangfang District of Harbin, the Announcement of the Xiangfang District on the Temporary Management of Temporary Management