Changed!If you are, they are very serious!

Author:Xiongfeng Dangyang Time:2022.09.22

I often go online "surfing"

You will lament everyone, you will

And in our work and life

Often also lament the citizens

Suggestions made in details

This is not

Some time ago

Leave a message

The large truck on the south road around the city

And Dangyang Yuyang Middle School (Xiongjiashan Campus)

There is a heavy match at night

The large truck travels in the crowd during school hours

There are security risks

It is recommended whether to restrict the big trucks for travel time

Adjust the students after the students go to school at night

in addition

Hope to Dangyang Yuyang Middle School (Xiongjiashan Campus)

The parking lot

The flowers on the periphery can reserve a few crowded channels

Avoid going through the parking lot from flowers and plants

Currently

The Municipal Traffic Police Brigade has targeted this problem

Relevant person in charge

During school during school

(6: 30-7: 30, 20: 00-20: 50)

Forbidden trucks to enter the school road

Tan Siqing

After verification, there are red and green light control at the intersection of Huancheng South Road and Xueyuan Road. Pedestrians take the zebra crossing. There is a central isolated guardrail in the middle of the road. There is no mixed between people and trucks. During school, there are trucks in the academy road. It is a truck construction of Mo Yunlan Ting in the community near the school and some road construction in the road of the school. Entry school roads to reduce hidden safety hazards. At the same time, the police forces of the education are maintained during the maintenance of traffic order during the upper and lower academic periods, ensuring the implementation of traffic control and control, and ensuring the safety of travel and smooth roads. Parents and students are requested to consciously abide by traffic rules.

at the same time

Municipal Construction Investment Group also launched construction on September 8th

Laying the aisle in the green belt

It has been rectified in place

Xie Yunpeng, the person in charge of the smart parking project of Yangjian Investment Group

During the construction of the parking lot opposite the parking lot of Yuyang Middle School (Xiongjiashan Campus), the Municipal Construction Investment Group did not fully consider the issue of the owner after parking the vehicle, which was very sorry for the troubles of the owners! The Municipal Construction Investment Group launched construction rectification on September 8th and laid the aisle in the green belt. It has been rectified in place. Maybe sometimes citizens leave a message

The questions mentioned look very small

But maybe these details are issues

Let Yicheng be better!

For other issues raised by citizens

The response from relevant departments is as follows:

Q:

Message of the masses: Personal ideas about the stagnant water of Changsaka Road Tianqiao: Tripped from the water above the Yuyang Community Hospital to the water above Changaka Road, set the rain and diversion, and find out the exit of the Champs Waterfront to the River. Separate diversion to the Normal Bridge to the long channel near the flyover. Trimming all the rainwater exports to Changsaka Road, which are all around Youyi Road, and ranked to Yuquan River in Shuiyi Road. Excessive rainfall area of ​​drainage in Changsaka Road is the main reason for waterlogging. After the rain and sewage diversion is implemented in the central urban area, the rainwater should be discharged as much as possible. Comments are not necessarily correct, but only one angle of viewing the problem.

A::

The Municipal Housing and Urban Construction Bureau replied: Hello! Thank you very much for your precious suggestions. The implementation of the suggestion plan you put forward is relatively difficult: Yuyang Community Hospital's rainwater pipeline exports are relatively low, from the middle section of the road to the high level of the ground. The difficulty is high; according to the current situation of the urban area, there is basically no drainage channel from Yuyang Community Hospital to Juhe, and the construction of the buildings along the street has been formed, and the arrangement is dense. It is difficult to implement the drainage channel here.

In order to improve the urban living environment and improve the problem of poor drainage of Changsaka Road and frequent waterlogging, the Municipal Housing and Construction Bureau combined with the "Systematic Implementation Plan of Dangyang City's Urban Waterlogging Governance" to hire the Yichang Urban Planning and Design Research Institute to The drainage transformation project from Yangtze Community Hospital to Qingshui Bridge was carried out.

This transformation retains the rainbow box culvert at the Qingshui Bridge, and adds a direct -line Baili Long channel at the same time on the Baili Changqu (at the Qingshui Bridge); 1392M long dual -hole 2.5 ~ 3 × 2m rainwater tank culvert, access to the current two -hole rainwater box culvert on the status quo of Nagasaka Road, recently adding a new drainage passage at the Qingshui Bridge in the straight line of a hundred miles long canal, and the rainwater box culvert of the East Road in the long term Line hundred miles long canal; transform the rainwater port to the joint multi -rainwater port to increase the ability to collect rainwater collection; use the original flow pipe as a sewage pipe to achieve rain and sewage diversion, and the local need to be transformed into dredging and transformation. The irrigation canal of Li Changcha and Sanli Port was renovated. The rainwater of Changaka Road was discharged into Sanli Port through Zhuwan Mingqu, Baili Changqu and Sanli Port irrigation canal, and eventually flowed into Joshi.

At present, the Changaka Road Drainage Pipe Network Reconstruction Project has entered the construction stage of the construction drawing. It is expected that the construction map design is completed in September 2022, and the construction is officially started in October. After the project is completed, the problem of waterlogging on Changsaka Road will be completely solved.

Q:

Message of the masses: Good leadership! It is recommended to open a station on the site of Zhang Yideng Spear at the bus, which is more convenient for Zhang Yideng Spear and the travel of the people around him. Because bus 1 has passed through this platform site.

A::

The Municipal Communications Bureau replied: Hello, thank you very much for your valuable opinions. At present, the 348 National Highway Zhang Yide Heng Spear is under construction. There is a hidden safety hazard in stopping the stop of bus vehicles here. After the construction of the transportation facilities here is improved, the Municipal Communications Bureau will consider the situation in the city and continuously meet the needs of the general public. Thank you again for your care and support for transportation. If you have other questions, please call 0717-3331463 in time.

Q:

Message of the masses: It is recommended to adjust the traffic signal lights of Jinping Avenue 0: 00-17: 00, because the traffic signal lights of this section are dense, there are almost no pedestrians during this period, and the traffic flow is small. For more than ten minutes, there are many unnecessary waste.

A::

The Municipal Public Security Bureau replied: Hello, thank you for your message! After research and judgment, the Municipal Public Security Bureau decided to optimize and adjust the time of the red and green lights of the glass factory, the intersection of the Public Security Bureau, and the Basling Telecom Bureau of the Basling Telecom Bureau. Because the second bridge intersection and the four bridge intersections are the main intersections in and out of the city, the traffic volume is large, it is not advisable to adjust, and the original phase time is unchanged. When the Municipal Public Security Bureau will pay attention to the changes in the traffic of the section in a timely manner, adjust the red and green lights in a timely manner, improve the smoothness of the road, and try its best to ensure the safety and smooth travel of citizens.

If you have any suggestions and opinions

Leave a message through the following way!

Participation method 1:

first step

Click the card below

Pay attention to "Xiongfeng Dangyang" WeChat public account

Step 2

Enter "Xiongfeng Dangyang" WeChat public account

Click on the menu bar below for public opinion collection

Enter "Public Opinion Collection" to leave a message

Participation method 2:

Through Hubei Dangyang.com

(Http://www.hbdangyang.com/)

Click on the left bay window

"Society of Social conditions and public opinion"

Enter a message

Participation method three:

Dangyang in Xiongfeng, Dangyang Rong Media

Leave a message after any tweet

Xiongfeng Dangyang WeChat to send benefits

In order to give back to the majority of readers, from now on, Xiongfeng Dangyang will jointly send a number of Changsaka Houttuynia cordata dew drinks with Hubei Australia Dragon Food Co., Ltd.. The method of obtaining benefits is very simple. Selecting a message in all the manuscripts pushed today (the number of likes that needs to exceed 15) is the first reader, and you can get the Nagasaka Pakpoint produced by Hubei Australia Dragon Food Co., Ltd. Houttuynia cordata dews a box.

Rules to receive prizes:

1. The winner must meet the WeChat public account of "Xiongfeng Dangyang" at the same time; the number of likes before 9:00 the next day is more than 15; the number of comments is ranked first.

2. Ji Zhan statistics as of 9:00 am as of the next day, and then the editor will reply to your specific award method.

3. Limited to one box per person per person, limited number, hurry up ~

Source 当 Xiongfeng Dangyang reporters 徐 Xu Yuan and Li Xinyi

Edit 凤 Peng Danfeng edited and reviewed ¦ Wang Rui Final Trial ¦ Wang Tao

- END -

Inadequate prevention and control of the epidemic, 22 cadres in Lhasa were held accountable and accountable

The report pointed out that since the epidemic occurs, all levels of the city and the majority of party members and cadres at all levels and the majority of party members and cadres can move and liste

"Blue Party Member" shows the role of responsibility in special fire prevention operations

Hello, I am a fire rescue staff. Now I have to conduct a safety inspection of your...