There are many recent constructions of around the city high -speed and Harbin high -speed high -speed speed, pay attention to safety
Author:Harbin News Network Time:2022.09.22
The owners on the highway of travel noticed that due to construction, some entrances and exit of Harbin Ring Expressway, Harbin High Speed, etc. are closed or some sections are limited. Please pay attention to safety.
Due to the maintenance construction, the Harbin Expressway went to the Harbin High -speed Yangtze River Road and the direction of Chenggaozi.+300 kilometers closed, mixed with lanes, and planned construction to be postponed until September 30; the entrance and exit of the Changjiang Road Station of the Harbin Ring Expressway is closed. The construction time is expected to be from 0:00 on September 21 to 24:00 on 23rd; Harbin around the city around the city;The entrance and exit of the High -speed Haruka Station is closed, and the construction time is expected to be from 0:00 on September 22 to 24:00.
Because of the maintenance and construction of the Harbin Route High -speed Sifang Bridge, Harbin Ring Expressway (Group Power to Songbei) K32+255 to K33+523 kilometers, temporary traffic control of emergency lanes, normally traffic lanes and overtaking lanes.At 24:00 on September 30.
Source: Harbin News Network
Reporter: Liu Xiyang
Edit: Liu Yixuan
- END -
A number of road construction has made the latest progress.
【Source: Han News】Non -motorized lanes on the way to work every dayWhen can it b...
Big snake patronizes farmhouse "Summer" and is trapped in the fire "snake catching in the net"
Cover news reporter Yu TingIn recent days, high -temperature weather in many places has long standby, and the temperature in many places has exceeded 40 ° C, which has made citizens shout unable