This morning, this bridge was officially opened to traffic!Zhaoqing and Foshan successfully "hold hands"
Author:Southern Plus client Time:2022.09.21
10 am on September 21st
Located at the border of Buddha Zhao
Dongjin Avenue third phase engineering control project
Mafangt Bridge
Formally opened to traffic!
It marks the entire line of penetration of Dongjin Avenue
Further accelerate the process of integration of Buddhism
Consolidate the ladder development foundation of the Guangzhou metropolitan area
△ Photo by Liao Wenyi
Economic development, transportation first. In recent years, the Zhaoqing Municipal Party Committee and Municipal Government have vigorously implemented the "East Advance" strategy, took the initiative to accelerate the integration of the Guangfo Zhao economic circle, strengthened transportation interconnection, and made every effort to build a fast road connecting Foshan -Dongjin Avenue.
Dongjin Avenue project
At the junction of Simiao House and Sanshui from the east
Eye -Qingqing High -tech Zone, Sihui City,
Zhaoqing New District, Dinghu District
West to Duanzhou District
The total length is about 53.92 kilometers
Ten to twelve lanes in both directions
Design speed
Main Road 80 km/h
40 kilometers/hour auxiliary road
△ Dongjin Avenue third-phase project-Dinghu Lotus to Sihui Dasha section. Photo by Liao Wenyi
There is no traffic light throughout the main line
After the opening of the traffic, it will be realized
The main road across the entire road is open quickly
The traffic ability is greatly improved
The traffic time is further shortened
△ Photo by Liao Wenyi
Mafangt Bridge
It is the last ring of Dongjin Avenue's third phase of the project
The bridge span Zhaoqing Beijiang
Total length 1639 meters
The main bridge length is 455.35 meters
The bridge type is the dual tower four cable surface dwarf tower cable -stayed bridge
The main tower is about 42 meters high, and the bridge width is 44.85 meters
Main road two -way six lanes
Design speed is 80 km/h
Auxiliary roads one -way two lanes
Design speed is 40 km/h
△ The direction of the three water of the Mafang Bridge. Photo by Liao Wenyi
The project officially started construction in September 2018
Now formally completed and opened to traffic
Successful "holding hands" Foshan
In the future, the two places to and from Buddhism will be faster
Strengthen the Guangdong -Hong Kong -Macao Greater Bay Area
Urban interconnection and integration upgrade have a positive role
Looking forward to more linkage in the future of Buddha Zhao!
Newss
Southern Selection
Shenzhen released multiple case warnings! Kainst epidemic prevention and control
The list is announced! These 175 are fake central enterprises
A message of WeChat, missing 35 years of thoughts!
Source | Southern+Client (Reporter Shi Liang Intern Li Shijing), Zhaoqing released
Edit | Hong Xin
School pair | Mu Yuankai
- END -
Send warmth in front of Lianxian Village
——Shaoyang Hospital to carry out Mid -Autumn Festival I do practical things for ...
Tianfu Tourism County Tour | Help the upgrade of the cultural tourism industry to promote the rapid advancement of the Zhongshui City project
▲ Photo of the Propaganda Department of the Municipal Party Committee of the Muni...