clear!National Day opened to traffic!There are two roads ...
Author:JAC Morning News Time:2022.09.21
September 19th
Su Song Road (South Second Ring Road-Shenzhen Road)
Fast Transformation Project
The northernmost section of Su Song Road Elevated
Perform the last layer of asphalt paving
According to the plan
Su Song Road will "hold hands" in the National Day to the South Second Ring Road
(Picture source: Municipal Urban and Rural Construction Bureau)
The construction site is asphalt paving on the right side of the main bridge. The first to the eighth union of the main bridge to the eighth union has 6 united beams, 2 united steel box beams, and the paving area is 14039.63 square meters.
Su Song Road is rapidly transformed in the 1 -standard section, about 1.1 kilometers in length, connected to the south two rings in the north, and the south to Lishui Road. After entering the construction in April this year, after the asphalt paving The construction has entered the "countdown". After that, the guardrail coating, expansion joint installation and other processes will be performed. It is expected to be completed on September 27. It is planned to be released to traffic on the National Day.
(Picture source: Municipal Urban and Rural Construction Bureau)
Except for Suusong Road Fast Transformation Project
There are two roads also come from good news
The reporter learned from the construction department
Xiangxihe Road (Qiaotou Ji Road-Huolongshan Road)
Science and Technology Road (Xuelin Road-Park Road) project
It has entered the end
The main lane can have traffic conditions before the National Day
Science and technology road construction site.
Xiangxihe Road (Qiaotou Ji Road -Huolongshan Road) and Science and Technology Road (Xuelin Road 1 Park Road) are located north of Daihe Road, Dongbu Town, Feidong County, all of which are new roads. The main construction contents of the project include road engineering, drainage engineering, transportation engineering, greening engineering, lighting engineering, pipeline comprehensive projects, power discharge (civil construction), and supporting affiliated projects.
Among them, the Xiangxihe Road Project starts from Qiaotou Road in the west, and it is about 1151.5 meters long in the east. The design speed is 40 kilometers/h. The two -way four -lane lane is planned as a urban secondary road.
From the north of the Science and Technology Road, Xuelin Road, the south to the park road, about 1320.5 meters in length, a design speed of 30 kilometers/h, and two -way lanes. It is planned as a urban branch road.
Xiangxihe Road renderings.
Science and technology road renderings.
According to reports, these two roads are located in the northern expansion zone of the Economic Development Zone of Feidong County. The construction of the project has played a positive role in improving the skeleton road network, opening the last mile of the park road, and promoting the development of robotic towns.
Xiangxihe Road Construction site.
Source: Hefei Daily
- END -
The four reservoirs in Guilin blocked the peaks, reducing the loss of 4.294 billion yuan
From the evening of the 16th to the 22nd, Guilin City had a large range of heavy r...
up to date!Our province adjusts the epidemic prevention and control policy
Qinghai News Network · Damei Qinghai Client News In order to coordinate the prevention and control of the epidemic and economic and social development, scientifically and accurately implement the pre