Ten Years Answers | Shanghe County: Build a big traffic pattern to build a new hub in the northern part of the provincial capital
Author:Shanghe Rong Media Time:2022.09.19
Shanghe Rong Media September 19th. In the past ten years, Shanghe County seized the major strategic superposition opportunities of the central, provincial, and municipalities, and set up "first chess" for transportation construction. Three -dimensional, from a single to diversified, the people of Shanghe have ushered in high -speed, railway, and airports. The level of comprehensive transportation services has been significantly improved. The traffic bottleneck restricted by Shanghe's economic and social development is broken. The "fast lane".
Shandong Longbo Construction Co., Ltd., located in Yinxiang Town, Shanghe County, is an enterprise in our county's main road, bridge and other projects. Since its account of accounting in 2012, the production scale of enterprises has continued to expand. As a building material company with a large demand for raw materials, Shandong Longbo Construction Co., Ltd. has a daily raw material transportation volume of 500 tons. The stable raw material supply is naturally inseparable from the support of local transportation conditions.
In the past ten years, enterprises have witnessed the huge changes in the transportation industry of Shanghe County. At the same time, the fast and diversified transportation pattern has also increased its strength to enhance the strength of the enterprise. In ten years, Shandong Longbo Construction Co., Ltd. has gradually become a participant in the construction of the transportation industry by the beneficiaries of the construction of the Shanghe traffic industry.
To get rich first, great development must be developed first. In the past ten years, Shanghe County has adhered to the construction of the people's satisfactory transportation as the overall goal, and builds an internal and external traffic network. Prior to 2015, Shanghe County was still a "three no counties" without high speed, no railway, and no airport. In just a few years, Shanghe County successively built high -speed, railways, airports, and "arteries" on foreign traffic. The three -dimensional transportation network of "internal and external linkage" has paved the fast track of Shanghe's economic development.
With the official entry of the high -speed rail this year, the important part of the Shanghe three -dimensional transportation system has been supplemented. The original high -speed, railway, and airport "three lacks and one" are about to become the past. The "high -speed rail era" and "aviation era". During the 14th Five -Year Plan period, the transportation of Shanghe County once again entered the fast lane. The bottleneck that once restricted the development of development has transformed into the advantage of accelerating development. Base.
The intersection of major strategies and the accelerated layout of traffic facilities have created new historical opportunities for Shanghe County to completely break the transportation bottleneck. , "T" -shaped high -speed rail network, "ten" type high -speed network, "One" -shaped railway freight line, "four vertical and three horizontal" trunk lines and "621" comprehensive transportation hub have been initially formed, from point line to three -dimensional to three -dimensional From a single to diversity, Shanghe will change from a "three county" to a city of interconnection.
Shanghe Rong Media Reporter Du Chunyi Antao
- END -
Chaoyang Street, Gaomi City: Go all the way to promote various key tasks.
Focus on the current key tasks and central tasks in Chaoyang Street, Gaomi City, g...
The backlog of residents of residents in Wushi residents has been applied to the residents.
On September 8th, Henan East Road, Henan East Road, Urumqi, has resumed daily work...