62 hindered roads have been restored to pass
Author:Guilin Daily All Media Time:2022.06.21
In the past few days, a large -scale heavy rainfall weather caused natural disasters such as landslides, mudslides, and landslides, which led to damage to many rural road roads in Guilin and blocked vehicles. It is reported that in order to ensure the travel safety of the general public, the city's transportation system was moved by "floods", quickly assembled rescue forces, timely dispose of dangerous situations, strengthen inspections and control of key road sections, and strive to seize the "Ping An Avenue" for the people. As of 12:00 today (21st), 62 roads have resumed smoothly, and the remaining 33 are being repaired.
The reporter learned from the Municipal Transportation Bureau that from June 1 to 12 noon from June 21, 95 of the counties, townships, and village roads in our city, including 24 county roads, 25 village roads, villages, village roads, villages village Tao 46. Among the 62 roads that resume the traffic, including 18 county roads, 17 township roads and 27 villages; 6 of the 33 roads are still under repair. Some roads are mainly distributed in Longsheng, Xing'an, Yangshuo, Gongcheng, Yongfu, Guanyang and Lin Gui.
According to the relevant person in charge of the highway management department of the bureau, according to incomplete statistics, the city's rural roads were destroyed by 170,700 cubic meters (about 50.8 kilometers), the road was damaged by 23,25 million square meters (about 14.31 kilometers), and the bridge was completely destroyed for 108 meters (2 2 (2 Seat), 638 meters (15 seats) of the bridge, 61 culverts were damaged, and protective projects were 18,400 cubic meters (121), 22.3 cubic meters (334) wave -shaped steel fences of 22.3 cubic meters (60). Cumulative 55.4458 million yuan.
"In order to restore the smooth flow of rural roads in our city as soon as possible, the Municipal Transportation Bureau fought all the members. 284 classes of machinery, investing funds of 23.189 million yuan. "The person in charge told reporters that the repair personnel in accordance with the work mechanism of the precedent and the posture, and the machinery and machinery were carried out nearby and made every effort to rescue the work. At the same time, accurately collected information And through the information platform, the first -line disaster situation is reported to the superior departments in a timely manner in the form of pictures and text; the road traffic conditions are released in time. On duty; strengthen highway inspections, strictly implement the 24 -hour duty system, timely discover and eliminate hidden safety hazards to ensure the safety of the lives and property of the people.
- END -
The route from Jingzhou, Hubei to Beijing Daxing Airport opened on July 1st
The reporter learned from the Jingzhou Shashi Airport in Hubei that the airport plans to open the route from Jingzhou to Beijing Daxing Airport on July 1.At that time, Beijing will become the first ci
Gao Mi encountered heavy rainfall and immediately launched a flood prevention emergency response
Qilu.com · Lightning News June 27th. Affected by the warm and humidity flow and ...