Sino -Russian East Line Natural Gas Pipeline (Anping -Shandong Tai'an Duan) is officially put into production

Author:Hebei Radio and Television Sta Time:2022.09.19

A few days ago, the "Industrial Doctor" of the Handan Innovation Research Institute of Peking University visited Handan Meimei's refrigeration equipment Co., Ltd. to provide technical guidance for enterprises to build an industrial Internet platform. Photo Conferring in Handan Innovation Research Institute of Peking University

Hebei Daily News (Reporter Song Ping) It was learned from the State Management Network Group that on September 16, the Natural Gas Pipeline of the China -Russia East Line (Anping -Shandong Tai'an) was officially put into production, which marked the further improvement of energy channels in the eastern part of my country, and the Bohai Rim region Energy supply capacity is continuously improved.

This time, the Anping to the Tai'an section of Hebei, which was completed and put into production, is an important part of the Sino -Russian East Line (Hebei Yongqing -Shanghai), the first smart channel for self -construction management and management of my country. The amount is 18.9 billion cubic meters per year, and there are 4 stations along the line. Among them, the Hebei section is 148 kilometers in length, with 7 valve rooms and 1 station field (Anping connecting the air station).

During the construction period, the State Management Network Group overcame the difficulties such as complex construction, multiple flood disasters, and repeated epidemics, and adopted innovative technologies to ensure the safety and reliability of pipeline construction and investment. The project adopts the "two -segment method" design and construction to cut the square slope to realize the technical breakthrough of welding on the stone square section ditch on the mountain area; the use of DR digital non -destructive detection and other technologies, greatly saving the construction period, and the engineering quality and efficiency have been significantly improved.

The starting point of the China -Russia East Line Natural Gas Pipeline Project is located at the China -Russia border in Heilong City, Heilongjiang Province. It ends at Baihe Mo Station in Shanghai. In the kilometers, the new pipeline is 3371 kilometers, and the construction of the north, middle and south sections is approved. The northern section (Heilongjiang Heihe -Jilin Changling) and the middle section (Jilin Changling -Hebei Yongqing) have been put into operation and operation. After the project was put into operation in 2025, it will further promote the upgrading of industrial structures along the pipeline and high -quality economic and social development, which is of great significance for building a clean and low -carbon, safe and efficient energy system.

- END -

remind!Jinan issued a flood prevention level 4 emergency response, and temporary traffic control is adopted by multiple sections

Shandong Business Daily · Sudao News reporter Xia Zifan Zhang ShuOn August 9th, J...

Qingshui in Gansu: After the relocation, the solid results distributed light to promote the revitalization

Since the beginning of this year, in accordance with the requirements of the provi...