Guangdong Provincial Department of Transportation: The construction of the Guangzhan High -speed Railway Guang Railway Construction Project started construction before the end of this year
Author:Guangzhou Daily Time:2022.06.21
Recently, the Guangdong Provincial Department of Transportation responded to the suggestion of Lin Qiaoyuan, a representative of the Provincial People's Congress, stated that the construction of the Guangzhan high -speed railway Guangtail Construction Project started construction before the end of this year.
According to the Provincial Department of Transportation, the Guangzhan high -speed railway and Guangtailong construction section project is the Guangzhou -Zhan high -speed railway Guangzhou Station (excluding) to Foshan Station (including). The total length of the main line is 24.3 kilometers, and it is built by the China Railway Guangzhou Bureau Group. The establishment of this generation must be implemented in 2022 Guangmao-Guangzhu Links and Guangzhu-Jingguang Links, and the Guangmao Line passenger car detour line is implemented. At present, the construction of Guangmao-Guangzhu Link and Guangzhu-Beijing-Guangzhou Links is under planning in an orderly manner; in addition, the design plan for changing the design scheme of the inner ring road under the Pearl River Bridge has been basically stable, and it is being fully promoted to implement the implementation of land acquisition and demolition implementation. The agreement was signed, and the Guangzhou Bureau Group plans to bid for construction after obtaining the construction map review report by October 2022, and the construction will be started before the end of this year.
The project of the Guangzhan High -speed Rail Trip Triangle Hub is the airport section of the Guangzhou -Zhanjiang Railway Xijiang Bridge to Xinxing South Station (DK50+328 ~ DK129+300, referred to as "airport section"), about 79 kilometers. The Provincial Department of Transportation said that due to the design plan of the Pearl River Delta hub airport, the initial design of the project has not yet obtained the joint approval of the National Railway Group and the Guangdong Provincial Government. The Provincial Party Committee and Provincial Government attach great importance to the construction of the airport section as soon as possible. Eliminating and establishing a joint working mechanism, actively promoting the design units and airport total map design units of the airport terminals to improve the air -rail fusion scheme. The Guangzhan high -speed rail design unit has completed the design of the airport section plan at the end of May 2022. The Provincial Department of Transport will follow up and coordinate the National Railway Group to complete the preliminary design approval of the airport section as soon as possible, and strive to start construction as soon as possible.
Text/Guangzhou Daily · Xinhuacheng Reporter: Longyu Guangzhou Daily · Xinhuacheng Editor: Peng Wenqiang
- END -
Yinshan Town, Dongping County: \"Three in place\" to defend the drowning safety bottom l
Yinshan Town, Dongping County do a good job of drowning, publicize and educate in...
Build a Beautiful Goose Tower | Girls Protect the Public Welfare Lecture to make the guardian one step closer
In order to further improve the ability of children's anti -sexual assault and sel...