awesome!The first plain wind farm in Guigang is completed

Author:Guigang Daily Time:2022.09.18

Recently, with the completion of the Y13 fan wind wheel and the last docking nut and the cabin, the high -pass wind power generation project of Guigang City has completed all the fan lifting construction, laying a good foundation for achieving the full capacity grid -connected power generation on September 30.

The Gao Chuan wind power project is located in Sanli Town and Wuli Town, Tantang District. The total area covers an area of ​​about 26.5 acres. The total installed capacity of the project is 60 MW. Among them, there are 2 wind turbines with a single machine capacity of 3.6 MW and 16 wind turbines with a single machine capacity of 3.3 MW.

The project is the first plain wind farm in our city and the largest wind power project with the largest height of the Guangxi plain fan. It refreshed a new record for the construction of wind power projects in our city.

After the project is completed

It is expected to save more than 30,000 tons of standard coal per year

Reduction of carbon dioxide nearly 100,000 tons

For alleviating the power supply and demand of our city

Improve energy structure and promote local economic development

Environmental protection is of great significance

Do you know?

The center height of the wheels of the fan is 140 meters

Ridge wheel diameter 164 meters

The cabin weight is 116 tons

A total of 6 tower tubes

The maximum weight of a single tower is 109 tons

Since the construction of the project, the employees of China Water Resources and Hydropower Eleventh Engineering Bureau Co., Ltd. have grasped the epidemic prevention and control of the epidemic, and the construction production has been completed in one hand. Construction tasks such as wires. In order to ensure that the progress of the lifting is not affected, to ensure that the project is generated on September 30, the project department has a multi -party coordination, scientific planning, and fine command to ensure that the safety of the lifting is always in the control of controllable, controlled, and capable.


The Propaganda Department of the CPC Guigang Municipal Committee hosted the Guidance of the CPC Municipal Committee of the CPC Municipal Committee of the Communist Party of China

Produced by Guigang Daily/Guigang News Network

Content source 创 Original China Water Conservancy Hydropower Eleventh Engineering Bureau Co., Ltd.

Picture source 庆 Zhang Qingjie, Luo Yingliang Yunlong

Video editing 悦 视 视 视 习 习: Wei Rou

Chief New Media Editor Luo Ying

Editor on duty 倩 Huang Qianqian

Duty head teacher, Xie Jingxiang

- END -

Longling community in Phuket Street explores home -school social enterprises and enterprises

With the guidance and support of the Municipal and District Women's Federation in ...

Welcome to the Celestial Travel | New Requirements for the Development of the Tourism Fate of Yunnan Province -Forging New Products of Kangyang Tourism

As the 2022 China International Tourism Fair is coming, the Cultural Tourism Headl...