Fighting on a front line 丨 In a tourist town, 88 projects welcome the "big test" at the La Training Meeting
Author:Chuanguan News Time:2022.09.16
Chuanguan News reporter Yan Qiao Photography Report
From September 15th to 16th, nearly a hundred cadres walked into Qingxi Town, Qingchuan County, Guangyuan City to participate in the first training session of the construction project of Datangjiahe Tourism Zone. This is the first large -scale project in Qingchuan County in recent years.
Qingxi Town is located in the western part of Qingchuan County. It is located at the foot of the Moto Ridge in the southern foot of the Mountain Mountains. There are Qingxi Ancient City, which has a history of more than 1,700 years of history. There is a giant panda National Park Tangjiahe area. "Playing cards", but because of the hinterland in the depths, its tourism development has been facing traffic bottlenecks for many years.
In September of this year, the Guangping Expressway, which lasted for 4 years, is about to open to traffic. Exports have been set up in Qingxi Town. Traffic problems in tourism development will be changed. Qingchuan County seized opportunities. Starting in May last year, it invested 1.5 billion yuan to build the "Datang Jiahe Tourist Area". On the month, 88 sub -projects have been established, and 37 projects have been completed.
Nearly a hundred cadres participated in 88 projects to practice.
In October of this year, the "two sections and one meeting" of the Sichuan Provincial Rural Cultural Tourism Festival (autumn), Guangyuan Da Shu Road Cultural Tourism Festival, and Guangyuan Cultural and Tourism Development Conference will be held in Qingxi Town. September is the sprint period of the construction of the Datang Jiahe project. How is the completion project? What is the progress of the project under construction? 88 projects ushered in the "big test".
Progress -based progress
Multiple projects 24 hours construction construction
Greening Landscape Project of Qingxi Exit and Line Road Road of Guangping High Speed is the first project observed by the participants.
"This project is only 900 meters, but this is the 'facade' of the tourist area of Datangjiahe and even the county." The mother of the Director of the Qingchuan County Transportation Bureau introduced that this is the only way for the Guangping Expressway to the Tangjiahe Visitor Center, 900 The total investment of Mi Road is 6 million yuan, and there are Hanyu, street lights, city walls, and landscape gate along the road. In June, the construction of the total project has been completed.
The reporter saw at the scene that the current projects such as Hanyu, street lights, painting and sculpture production on the road have been completed, and more than 10 workers are under construction.
Following the road, it reached the construction of the Tangjiahe Visitor Center project under construction.
In the past, the Tangjiahe Visitor Center was located in the Guanhu Protection Station in the Tangjiahe area of the Grand Panda National Park. Only the ticket function and the insufficient service facilities were not conducive to the protection of Tangjiahe. During the construction of the Datangjiahe Tourist Area project, the visitor center moved forward to the next to Qingxi Town. It is planned to have more than 1,200 parking spaces, and at the same time, it can realize the needs of eating, drinking, playing, playing, playing and entertainment.
Tangjiahe Visitor Center renderings.
"The preliminary design of the project costs more time. The construction of construction is June this year, and 57%has been completed in 3 months." Nie Zhengrui, the person in charge of the project, introduced that the parking garage in area A was basically installed. The project square was completed immediately. The main project is trying to fight. In order to speed up the construction progress, more than 260 workers fell in 3 classes, and they continued to work for 24 hours.
"Dry hard during the day, pick the lights at night, work hard on sunny days, grab it at night, and work overtime on holidays." Go to the slogan to get rid of it.
Immersive performing arts project in Datang Jiahe Tourism Area.
Although it is only in one town, the "La practice" points are dense and rich in information. The participants walked from early to night. They not only looked at the results, but also paid attention to the "see the doorway" and shared the difficulties and experience behind the construction of the exchange project.
Qingzhu Island Ecological Kanglie Community signed a contract last August and started in November. It was the first investment promotion project of more than 100 million yuan in the Tangjiahe tourist area with a total of 1.5 billion yuan. "The project has three major difficulties in relocation, coordination, and difficulty in construction." Qin Rui, the person in charge of the project of Qingzhu Island Ecological Recreation Travel Community. Five projects including the Tangjiahe Visitor Center, the Qingjiang River Bridge and the connection line are simultaneously constructed around the project. The headquarters has held 16 coordination meetings, and 23 complex issues such as border plots are dealt with to ensure that each project is handled together.
"The project is close to the Tangqing Line's reconstruction and expansion project. Our encirclement is on the construction work surface of the road. At the same time, the high -side slope formed by the road and stone recovery of the roads and stones has a certain safety hazard for the foundation pit of our internal excavation. In the length of nearly 200 meters, there are multiple crossing construction places. "Qin Rui introduced that for the smooth and orderly construction of the two parties, the company and road construction units communicated with many meetings and on -site. Qingzhu Island Ecological Kangli -Travel Community Project avoided construction by the road by the road, and the peaks from peaks to night construction. "Each concession, the construction of the peaks, ensure the smooth and orderly projects of both parties, and reduce the interference with pedestrians."
"Cross -construction" is not only the Qingzhudao Ecological Kanglig Travel Community Project. In the construction of the Datangjiahe project, 88 projects are promoted at the same time. About 1,200 workers are constructed at the same time every day in multiple sub -projects. According to incomplete statistics, the construction headquarters and 3 sub -headquarters of Datang Jiahe Tourism Zone have held more than 300 Solving the interception of project cross -construction problems.
Completion project comparison
There are staged results but need to be more fine
"The Yinping Ancient Road Museum is opened!" "The Qingchuan County Department was unveiled!" During the "La Training" period, multiple projects officially opened. Qingxi Ancient City has a history of more than 1700 years. It is the place where "soldiers must compete" and "business travel must pass". It has become the place where the counties and counties have many times. Problems such as insufficient digging.
In the construction of the Datang Jiahe Tourism Area, Qingchuan County was rebuilt in accordance with the development concept of "let culture move and let history live", and the "County Department" was rebuilt in accordance with the Ming and Qing architectural style.
History, culture and natural ecology are the two most important business cards in the Datang Jiahe Tourist Area project. The Tangjiahe area of Grand Panda National Park, which is close to Qingxi Town, is known as "the genetic library of the world's animals and plants".
Although the encounter is high, wild animals are unsure.
How can tourists come to Tangjiahe to see wild animals? During the "La practice" period, the "Zhiyou Qingchuan" APP was also officially launched. The app connected to Tangjiahe's camera. When animals appeared, mobile phones would pop up prompt information, allowing visitors to watch wild animals online. "'Internet+ecology' realization allows the combination of rare and plant protection and tourism." Wang Lu, director of the Qingchuan County Cultural Tourism and Sports Bureau, introduced.
Nearly a hundred cadres who participated in La Trainee took a scoring table to score the projects and completion projects, including the ancient city commercial street investment shops.
"The change is great, shocking!" During the latter, many cadres lamented that more than a year, the ancient city of Qingxi, Yinping Village, and Tangjiahe had changed dramatically.
"Staged results encouraged morale and inspiring." Long Zhaoxue, vice chairman of the Guangyuan CPPCC and secretary of the Qingchuan County Party Committee, said that this practice will not only add confidence in the construction of the economy, but also inspire morale. The last 30 days.
Yinping Village Die Water Platform.
Walking on the slate road on the stacking water platform of Yinping Village, the slate shakes slightly. "Some projects are still rough, but the tourism projects must be fine. It is not necessary to pay attention to the fineness and beauty. Not only must the hardware be built, but more importantly, it is operating." Long Zhaoxue said.
How to do the last sprint period? At the La practice evaluation meeting, all unsuccessful construction projects must be rowed upside down, and the completion projects must be optimized to fully attack the last time of construction.
- END -
Ministry of Civil Affairs: Special operations to combat the special action of pension fraud have been investigated for a total of 270,000 pension service agencies and venues
On the morning of September 8, 2022, the Propaganda Department of the Central Committee of the Communist Party of China held a series of theme press conferences of the Ten Years of China. Li Banghua
Construction of Qiqihar Tiefeng Comprehensive Logistics Park
On the morning of July 17, the Heilongjiang Provincial Traffic Investment Group an...