Publicity!Taiyuan will create 9 new people's crossing bridges and see where is it?

Author:Taiyuan Daily Time:2022.09.16

1. Project background:

In order to supplement and improve the street facilities crossed by our city and solve the problem of crossing the streets in key areas, Taiyuan Urban and Rural Infrastructure Construction Center intends to build Heping Road in North Central, Xizhong Ring North Street, Xuefu Street Xudong Road, Gangyuan Road Yangqu Middle School, Binhe East Road Beigu Village, Binhe East Road, Changsheng Street, Binhe West Road Yongle North Street, Binhe West Road Binhu Street, Binhe West Road Tianlongshan Road people walk on the bridge.

Second, design plan

(1) The specific location and renderings of the bridge are as follows:

1. Pei -Passenger Travel Bridge in Beizhonghong: It is about 150 meters east of Jinhui Road in Jinhui Road, Beizhong Ring Street, and about 470 meters from Heping North Road in the east.

Peace Passer -Passenger Bridge in the North Central Ring

2. Person Bridge in the North Street of Shagou in the west: It is planned to build a flyover of about 75 meters north of the north of the north of Shagou, Xizhong Ring, and about 530 meters north.

Piexi Bridge in North Street in Shagou in the west

3. Xuefu Street Xudong Road crowded bridge: It is planned to build a flyover to the east to Xudong Road, the east and middle of Xuefu Street, about 412 meters from the east and middle, and about 232 meters from the west side of the west side.

Xuefu Street Xudong Road people Xingqiao Bridge

4. Steel Garden Road Yangqu Middle School Person Bridge: It is proposed to build a flyover in Yangqu Middle School in Gangyuan Road, Shengcaota.

Steel Garden Road Yangqu Middle School People Travel Bridge

5. Bridge Bridge Binxiao Village, Binhe East Road: It is planned to build a flyover of about 30 meters north at the intersection of Binhe East Road and the current situation.

Bridge of people in Beingsong Village, Binhe East Road

Bridge of people in Beingsong Village, Binhe East Road

6. Binnie East Road Changsheng Street Person Bridge: It is planned to build a flyover of about 150 meters north at the intersection of Binhe East Road and the current situation.

Binxiu Street Bridge on Binhe East Road

7. Binhe West Road Yongle North Street Person Bridge: It is planned to build a flyover about 20 meters north at the intersection of Binhe West Road and Yongle North Street.

Binhei West Road Yongle North Street Person Bridge

8. Binhu Street Binhu Street Binhu Street Bridge: It is planned to build a flyover about 100 meters north at the intersection of Binhe West Road and Binhu Street.

Binhu West Road Binhu Street Person Bridge

Binhu West Road Binhu Street Person Bridge

9. Bridge on the south side of Tianlongshan Road, Binhe West Road: It is proposed to build a flyover on the south of Binhe West Road and the south side of Tianlongshan Road.

Panchian Bridge on the south side of Tianlongshan Road, Binhe West Road

(2) Bridge type and overall layout

The pedestrian bridge uses a variable section of continuous steel box beam bridge.

1. The cross -bridge of Heping passersby in the North Central Ring is 41 meters+41 meters. The bridge pier is set in the central partition belt and the two sides of the green belt, and the two ends are set with 1: 2.8 ladder road and 1:12 ramp.

2. The cross -bridge of the north street of the west, the north street of Shagou, the cross -bridge is 34 meters+31 meters; the bridge pier is set in the central partition zone and the two sides of the green belt, and the two ends are set with 1: 2.8 ladder road and 1:12 ramp.

3. Xuefu Street Xudong Road passenger bridge is arranged 26.7 meters+26.7 meters; the bridge pier is set on both sides of the central separation band and the green bands on both sides of the road, and the two ends are set with 1: 2.8 ladder road and 1: 4 ladder slope.

4. Gangyang Luyangqu Middle School people cross the bridge with a single span, 34.2 meters span, and the bridge pier is set on the non -separatist zone of the machine. The two ends are set with 1: 2 ladder road and 1: 4 slope.

5. The cross -bridge of the Binhe East Road Beigu Village is 15+35.5 meters. The bridge pier is located in the main and auxiliary parts of the west side of Binhe East Road and the green line outside the road. 12 Land Road connects the sidewalk on the current situation of Binhe East Road.

6. Binhe East Road Changsheng Street Panqiao Bridge is arranged 31+31 meters. The bridge pier is located in the main and auxiliary parts of the east side of Binhe East Road and the green space outside the road red line. The road with the current situation of Binhe East Road and the riverside bicycle lanes.

7. Binhe East Road Yongle North Street people cross the bridge over 21.5+27.9 meters. The bridge pier is located in the main and auxiliary parts of the west side of Binhe West Road and the green line outside the road. The road is connected with the sidewalk and Binhe bicycle lane on the Binhe West Road.

8. Binhe West Road Binhu Street Panqiao Bridge is arranged 26.1+27.4 meters. The bridge pier is located in the green belt on the west side of Binhe West Road and the west side of the road. The slope is connected with the sidewalk, Fenhe Park, and Binhe bicycle lane on the current situation of Binhe West Road.

9. Binhe West Road Tianlongshan Road south side of the crossing bridge is arranged 33+40 meters. The bridge pier is set in the main and auxiliary zone of the west side of Binhe West Road and the green belt outside the road. : The 4 -ladder slope is connected with the sidewalk on the current situation of Binhe West Road, and the 1: 4 ladder slope is set on the east side to connect with the current Fenhe embankment.

(3) Crossing surface

The horizontal section of the overpass is: 4 meters of bridge clean, 0.2 meters of fences and structures on each side, with a total width of 4.4 meters.

The horizontal section of the ladder road is: 2.4 meters of ladder roads, 0.2 meters on both sides, with a total width of 2.8 meters.

(4) Technical indicators

The crowd load is set in accordance with the "Technical Specifications for Urban People Traveling Bridge and Traveling Authenticity";

Motor lanes are clean ≥4.5 meters, non -motorized lanes are empty ≥3.5, and sidewalks are ≥2.5 meters.

Publicity time: September 16, 2022 to September 26, 2022

If there are different opinions on the stakeholder, in writing (indicating the name, telephone, and contact address of the contact person) before September 26 to (send) to the City Planning and Natural Resources Bureau 408 in the City Planning and Natural Resources Bureau of Jingangyan Road before September 26.

Technical consultation Tel: 3586540 Opinion Feedback Tel: 3586806 Post Address: No. 2 of King Kongyan Road: 030002

Taiyuan City Planning and Natural Resources Bureau

September 16, 2022

Source: Taiyuan City Planning and Natural Resources Bureau

- END -

The most beautiful doctor Ma Wenyi: Common diseases can be treated in the county, reducing the burden on patients

The National Health and Health Commission held a meeting of Chinese and foreign jo...

Social comment: The world's tight strings are time to loosen the G20 mechanism

The Foreign Minister of the Group of the 20th Group was held in Bali, Indonesia from 7th to 8th. Urgent issues such as food and energy crisis were the focus of this meeting. In the context of Russia a