Zhuanghe people pay attention!"Plum Blossom" is getting close, and heavy rain continues, please prevent

Author:Peninsula Morning Post Time:2022.09.16

Zhuanghe people pay attention

"Plum Blossom" is getting closer, and heavy rain continues

Pay attention to prevent!

1. Typhoon live and forecast:

Typhoon "Plum Blossom" No. 12 this year was moved into the Bohai Sea Strait from the Shandong Peninsula today (16th). At 11 am, it is located on the sea of ​​the Bohai Strait, about 58 kilometers south of Dalian City, and the largest wind near the center of the center (23 meters 23 meters (23 meters 23 meters /Second), the lowest air pressure in the center is 990 hundred Pache, and the seven -level wind ring radius is 90 to 170 kilometers. On the 16th, the center of the typhoon "plum blossom" (tropical storm) before 12:40 on the 16th landed again in Jinpu New District, Dalian City, Liaoning Province. When landing, the maximum wind near the center was 9 (23 meters/s), and the lowest air pressure in the center was 990 hundred hundred hundred hundred hundred. Pa will gradually become a green cyclone.

2. Storm

1. Precipitation Live:

Affected by the periphery of the typhoon "Plum Blossom", from 08:00 on the 14th, precipitation weather appeared in Zhuanghe City. As of 13:00 on the 16th, the average rainfall of Zhuanghe City was 182.4 mm, and the cumulative maximum rainfall was 252.4 mm. Shannou Village; the maximum rainfall of the hour, 47.2 mm, appeared in Guangming Mountain Town.

2. Style live

As of 13:00 on the 16th, levels of 7-9 of the waters in our city and surrounding areas appeared in the upper winds of level 7 to 9. The maximum gusts appeared in the toad Island resort. The wind speed was 21.5 meters/s, the wind was 9, and the wind direction was northern wind.

Third, the typhoon "plum blossom" affects the forecast of the wind and rain in the Zhuanghe area

Rainfall forecast: It is expected that from the afternoon of the 16th to the night, there will still be medium rainfall in our city. The process of rainfall is 20-30 mm. The rainfall will gradually end in the middle of the night before the 16th.

Dafeng forecast: From the north to the northeast wind, 6 to 7, gusts 8 to 10 to the evening of the northwest wind 6 to 7, gusts 8 to 10 in the morning of 17 to 6, gust 7 to 8 to 8, the north of the Yellow Sea Southeast wind 8 to 9, gusts 10 to 12 in the afternoon rotating wind 7 to 8, gust 9 to 11 to the morning of the 17th, to the northwest wind 6 and gust 7 to 8.

Fourth, follow and suggest

1

The heavy rainfall of this rainfall process is very easy to cause secondary disasters such as floods, mudslides, landslides, and urban and rural waterlogging in small and medium -sized basin. Please strengthen prevention from relevant units.

2

Pay attention to the influence of strong winds on billboards, construction sites, facilities agriculture, etc. Relevant water operations and past ships are requested to return to Hong Kong to avoid wind, strengthen port facilities, and prevent the ship's anchor, stranding and collision.

3

The weather process is strong and strong, accompanied by strong convection weather, reminding the public to try to avoid outdoor activities.

Source: Zhuanghe Published

related news

The 26 deputy city -level leaders of Zhuanghe all sinking all the sinking lines of a total of 2850 people

Morning News (Zhao Jinhua Peninsula Morning News, Chief Reporter of 39 degrees video Zhang Ximing) Since 8:00 on September 14, decentralized rainfall occurred in Zhuanghe City. By 13:00 on September 16, the average rainfall of 55 test stations in the city was 182.4 mm. The maximum cumulative rainfall is 252 mm. At 18:00 on the 15th, a level II emergency response was launched. All 26 deputy city -level leaders sank to the field supervision of Baobao Town Street. By 17:00 on the 16th, a total of 2,850 people had been transferred. The fishing vessels returned to Hong Kong and the nearby Hong Kong 3098 ships were reported.

The city's 37 reservoirs, Zhu Xi, Jung Tower, Yongji and other large and medium -sized reservoirs pre -leaked at 22 on the 14th. The 30 small reservoirs opened the water pouring hole at 8 o'clock on the 15th. The Ying Na River Reservoir and the Bi Liuhe Reservoir started pre -leaking at 10:00 on the 15th.

On the afternoon of the 15th, after the Dalian Defense Typhoon "Plum Blossom" was over, the Zhuanghe City's defense finger held a meeting as soon as possible to re -mobilize the flood prevention work of Taiwan. Flood prevention work is extremely lost. At the same time, in accordance with the requirements of the emergency response of the flood control level II, focus on the focus on the focus of 14 work instructions, list lists, explicit responsibilities, and fixed tasks to ensure that various defense measures are implemented in detail.

At 18:00 on the 15th, a level II emergency response was launched. From 54 municipal departments, 177 people rushed to the front line to assist the town and streets for flood prevention. All members of the township and street cadres and the "two committees" team members of the village and village were all on their jobs. 31 reservoir flood control persons, 85 important riverside flood control persons, 244 water management officers, and 31 warehouse managers carried out hidden dangers to key dangers of flood control areas all over the weather. Inspection and inspection on duty.

According to the requirements of the emergency response of the Flood Control Class II, except for about 12,000 teachers and students in the school in 8 boarding high schools, all 123 schools and kindergartens have been suspended, and nearly 58,000 teachers and students live in their homes. The city's 26 construction sites were suspended, 9 hazardous chemical companies were suspended, and 10 passenger ships were suspended.

Relevant departments will carry out seawall inspections in the same local townships and towns, and do a good job of preparation and emergency rescue preparations for seawalls in 14 weak and dangerous areas. The agricultural department organized 63 agricultural facilities and 40 drainage ditches. Transportation, housing construction, and townships (streets) have been implemented, preparing for the utensils, and preparing for trees to clean up. Electricity, communications, transportation, water supply, drainage, gas and other departments have done emergency defense work in infrastructure to maintain normal operation. Urban flood prevention emergency teams and traffic police officers are on their jobs. Low -lying water -watering areas have been prepared for strong arranging, drainage gates and drainage wells have been opened.

- END -

In the first half of the year, the operating income of central enterprises increased by 12% year -on -year

Xinhua News Agency, Beijing, July 22 (Reporter Liu Yujia and Wang Xi) In the first...

Weihai: Installing anti -collision "radar" escort fishing boat safety

The fishing boat goes to the sea, safety is the first priority. This year, the ins...