I heard the "flood" and moved, this town does a good job of flood prevention and drainage!
Author:Chai Sang District Rong Media Time:2022.06.21
In the past few days, there have been continuous rainfall weather in our district. Faced with the severe flood prevention situation, party members and cadres of Jiangzhou Town moved to the first line of flood prevention work, weaving secret flood prevention "safety nets", and fully guaranteed to ensure full guarantee The people's lives and property are safe.
The reporter saw in the Jiangzhou Yangtze River embankment that the villagers were cleaning the weed trees of the dam. It is reported that recently, Jiangzhou Town has opened a 34.56 kilometer -long embankment section, which has fully opened the clearing and obstacle projects to prepare for the flood prevention.
"Under the overall arrangement of the Jiangzhou Party Committee and the government, there is no flood and flood prevention, and the flood will be a large flood and prevention." Said Sang Peide, secretary of the Party branch of the Jiangzhou Town Water Committee. According to him, the full -scale obstacles of the 34.56 kilometers of Jiangzhou's 34.56 kilometers have ended. The Water Committee will continue to actively participate in flood prevention work to ensure that the next step of flood prevention work will be carried out steadily.
At the same time, Jiangzhou Town also moved rapidly to actively drainage. For the field plots of stagnant water after the rain, organized personnel and machinery to adopt the working method of "segmented and dry+all day" to ensure 24 -hour operations.
Sang Peide, secretary of the Party Branch of the Jiangzhou Town Water Committee, said that the drainage was uninterrupted through 27 units of 27 units in the town's ten pump stations for 24 hours, and all the water accumulated in the fields had been pulled out. The stagnant water is basically ranked in the channel, and it is not flooded to the masses.
In addition, Jiangzhou Town is based on the standards for preparation of flood prevention, anti -floods, rushing danger, and disaster preparation. Preparation work to ensure the safety of the dam.
Sang Peide, secretary of the Party Branch of the Jiangzhou Town Water Committee, told reporters that the current flood control supplies are divided into a few fast. The first flood control stone has prepared 8562 square meters, flood control wave piles have prepared 7,500 roots, and 410,000 floods and snakeskin bags are prepared. The three -color cloth is 750 sleepy, some of which are assault boats, life jackets and so on.
(Luo Daoming, Rong Media Center, Chai Sang District)
- END -
Weinan Intermediate People's Court launched the "Moral Lecture Hall" to strengthen ideological and moral construction
On June 23, in order to solidly promote the construction of the courts and spiritu...
Turn off!Without implementing the responsibility for epidemic prevention, 35 places were shut down (No. 58)
In order to do a good job of preventing and controlling the prevention and control of the epidemic, strictly implement the requirements for the prevention and control of the epidemic, supervise the im