Relieve the traffic pressure of Kunming Road and Technology Road Xi'an Ringcheng Expressway-Fuyuan Fourth Road 2024 completed and opened to traffic
Author:The official account of Xi'an Time:2022.09.16
On the 14th, the Municipal Government's Executive Meeting reviewed and approved the "Request on the Entrying the West Section of Dazhai Road (Ring City High Speed-Fuyuan Fourth Road) Engineering Design Scheme". The project is planned to be opened to traffic in June 2024. After completion, it will improve the comprehensive transportation system in the western area and alleviate the traffic pressure of Kunming Road and Technology Road.
In recent years, the road traffic network of the main urban area has been basically formed, but the peripheral group is under large -scale development and construction, and road traffic facilities need to be improved. The construction of Dazhai Road is the need to improve the layout of the road network in the western area and the need to build the intersection of the western region.
It is reported that the western section of Dazhai Road (around the city highway-Fuyuan 4th Road) is planned as a urban secondary road, with a total length of about 3.9 kilometers. Among them The Fuyuan Third Road section has not been built by the winding high -speed speed, the Afang Palace vehicle section, and the west household railway. Considering the connection with the second road of Kunming, the Tongdong New Town, the starting point of this design extends west to Hanchi Road, and the end point is Fuyuan Fourth Road.
The western section of Dazhai Road (around the city highway-Fuyuan 4th Road), the road planning red line width is 40 meters to 57 meters. The main line of viaduct+ground auxiliary channel is adopted. The starting point of the viaduct is the east side of the intersection of Kunming 2nd Road and Hangchi Road. (Among them, 182 meters within the range of the vehicle section have been completed as planned). A pair of parallel ramps are arranged on the east side of the detour highway to facilitate communication on both sides of the road; a pair of parallel ramps are added to the West House Railway, for the ground motor vehicles on both sides of the Xido Railway and the slow -moving system to cross the Xido Railway. At the same time, three slow -moving system flyover is added in three places three places across the cities, the Afang Palace vehicle section, and the Xido Railway. Simultaneous designs such as rain and sewage, lighting, transportation, greening, etc.
It is reported that Dazhai Road, as a cities with a better across region in the western region, connecting the Lodong New Town and the main city, which provides an important guarantee for promoting the connection between the area. The construction of the project will provide more convenient traffic conditions for the development of the business format along the Dazhai Road, especially the main urban area can be directly reached through the Dazhai Road to reach the Ladong New Town Happy Valley.
Source: Xi'an Newspaper All Media Reporter Ma Zhao
- END -
Yunlong Traffic Police awarded the "Most Beautiful Driver" Award
You can let the pedestrians in the driving ceremony to praise your civilization dr...
Few people pay attention to this blind spot, but it is easy to cause accidents!| Daily safety
Source: Shandong Traffic Police