Changyi Changsha to Changsha section officially entered the trial operation stage
Author:Wangcheng District Rong Media Time:2022.06.21
Today (June 20), the Changyi Changtong Railway Yiyang to Changsha section officially entered the trial operation stage.
On June 20, the trial train was opened from Changsha Railway Station (intercity field) (unmanned photo). Xinhua News Agency
Chang (German) Yi (Yang) Long (sand) railway is an important part of the country's "eight vertical and eight -horizontal" high -speed railway network. The new line starts from Changde City in the west, and has benefited Yangshi City. It introduces Changzan City Changsha West Station. There are 5 stations in Changde, Hanshou South, Yiyang South, Ningxiang West, and Changsha West. The design speed is 350 kilometers per hour.
It is understood that since the joint test of the Changyi Changchang Railway on May 8th, the Changye -Chang Railway Yichang section has successfully completed the work of speeding up and signal testing and testing by the EMU. After the acceptance of the trial operation, the Yidong section will be officially opened.
The above pictures are from Xinhua News Agency
Changyi Changchang Railway Yichang section geographical location
The Changyi Changchang Railway Yichang section is located in the northwestern part of Hunan Province, and passes through 2 cities and 6 counties along the line.
Line length
The line length is about 64.2 kilometers, of which 43 are the main line bridges and tunnels, and the bridge -tunnel ratio is as high as 79.5 %.
Site settings
The Changyi Changye Railway Yichang section has three stations: Yiyang South, Ningxiang West, and Changsha West. The design speed is 350 km/h. Construction started in June 2019.
Earlier, the Changye -Chang Railway Changde to Yiyang section has officially entered the rail paving stage on June 16.
This time, the Changye -Chang Railway Changye section, the main construction tasks of the rail paving contain the main line of the main line, the front rail is 163.257 kilometers, the station line paving is 13.47 kilometers, and 54 groups are laid on the road.
After the completion of the Changyi Chang project, Changde will only take less than one hour to Changsha. At the same time, it will achieve the goal of the 14 cities and state high -speed rail in Hunan Province.
- END -
The "Poverty Alleviation Workshop" at the entrance of Nanjia in Qingyuan allows the disabled to realize the employment dream!
Thanks to the company's recruitment, I don't mind that I am the disabled, and ther...
Yuncheng Salt Insurance Center launched a survey of salt lake water system on the 244th day
Wu surname Hubei -a north and south roads, divided the village of Wu into the vill...