Twelve months of construction!It's related to Fuxing Street →

Author:Yan Zhao Evening News Time:2022.09.15

In accordance with the requirements of the municipal urban construction plan, the demolition of the newly -built project of Fuxing Street and Yutong 1 Bridge of Fuxing Street and Yuhua Road will start construction at 22:00 on September 15, 2022.

1. Construction time

From September 15, 2022 to September 15, 2023, the construction period is 12 months;

2. Construction method and traffic organization

The bridge pile foundation, Chengtai and upper structures are carried out on the connection line of Fuxing Street and Yutong 1 Bridge E ramp of Yuhua Road.During the construction period, the E ramp (Shun Fu Xing Avenue from the south to the north from the west exit of Yuhua Road to the East Second Ring Ring) is prohibited from passing the motor vehicle. The motor vehicle can pass the F ramp from the east exit of Yuhua Road, at Yuhua RoadTurning up with Mount Everest Avenue, then running west of East China Road.

Source | Shijiazhuang Public Security Traffic Police

- END -

"2022 Guo Chaojing Festival-Guo Chaoxin Consumer Design Contest" was officially launched

On September 1, 2022, hosted by the Beijing Municipal Bureau of Commerce, the 2022...

Retirement of retirees in our state is all issued in place

On August 4, the reporter learned from the State Social Insurance Administration that the state has completed the adjustment and capital increase of the basic pension benefits and capital increase of