Put on the thirty ports!The east extension line of Line 2 penetrates!

Author:Hefei Daily Time:2022.09.14

latest news!

Hefei Rail Phase III Construction Planning Route

There are new progress!

East extension of Hefei Rail Line 2

The left line of the "Huxiang" range has been successfully connected recently

This is the east extension of Line 2

Article 17 The shield single -line interval

It is understood that the left line from the Xianghe Road Station to Xianghe Road Station is 717 meters in length. It mainly crosses the soil layer is hard plastic clay, and the vertical surface of the interval is a "V" slope.The shield machine starts from the moat station, laid east along the Yangtze River East Road, and receives Xianghe Road Station.

"Wearing the thirty -port river and the thirty -port river bridge under the interval, the interval range is densely pipeline, and the construction accuracy requirements are high." The relevant person in charge of Hefei Rail Group introduced, "In order to grasp the progress steadily, the scientific organization and refinement of our scientific organization and refinementConstruction tasks, strengthen safety control, keep an eye on key processes, and successfully achieve the goal of interval through the task. "

As of now, all the main structure of the 11 stations of Line 2 has been capped, and the 24 shield single -line interval has been connected.


Wen Tu | All Media Reporter Wang Junchao

Edit | All media editors Zhou Qiao

Produced | "Lakeside Point" Rong Media Studio

- END -