Twelve months of construction!It's related to Fuxing Street →
Author:Shijiazhuang Daily client Time:2022.09.14
In accordance with the requirements of the municipal urban construction plan, the demolition of the newly -built project of Fuxing Street and Yutong 1 Bridge of Fuxing Street and Yuhua Road will start construction at 22:00 on September 15, 2022.
1. Construction time
From September 15, 2022 to September 15, 2023, the construction period is 12 months;
2. Construction method and traffic organization
The bridge pile foundation, Chengtai and upper structures are carried out on the connection line of Fuxing Street and Yutong 1 Bridge E ramp of Yuhua Road.During the construction period, the E ramp (Shun Fu Xing Avenue from the south to the north from the west exit of Yuhua Road to the East Second Ring Ring) is prohibited from passing the motor vehicle. The motor vehicle can pass the F ramp from the east exit of Yuhua Road, at Yuhua RoadTurning up with Mount Everest Avenue, then running west of East China Road.
Source: Shijiazhuang Radio and Television Reporter Du Wenjia
- END -
The Xinjiang Railway continues to build a "Traveling on Xinjiang" brand to help Xinjiang Cultural Tourism Industry Development
Enter the summer heat, and it is hot with the weather. On July 9, two traversal tr...
Is it too hot to wait for the bus outdoors?The waiting booth here is more cool
Video/Snapshot, T_100, F_JPG, M_fast Controls = Controls data-version/ueditor/vide...