Motor vehicles are prohibited in this paragraph!Fuxing Street and Yuhua Road are about to be constructed
Author:Hebei Radio and Television Sta Time:2022.09.14
Shijiazhuang City Fuxing Street and Yuhua Road Interest 1 Bridge Demolition During the construction of the newly -built project during the construction period
In accordance with the requirements of Shijiazhuang Municipal Urban Construction Plan, the demolition of the newly -built project of Fuxing Street and Yutong 1 Bridge of Fuxing Street and Yuhua Road is scheduled to start at 22:00 on September 15, 2022.
1. Construction time
From September 15, 2022 to September 15, 2023, the construction period is 12 months;
2. Construction method and traffic organization
The bridge pile foundation, Chengtai and upper structures are carried out on the connection line of Fuxing Street and Yutong 1 Bridge E ramp of Yuhua Road.During the construction period, the E ramp (Shun Fu Xing Avenue from the south to north from the west exit of Yuhua Road to the East Second Ring Ring) is prohibited from passing the motor vehicle. The motor vehicle can pass the F ramp from the east exit of Yuhua Road, at Yuhua RoadTurn around with Mount Everest Street and drive west of East China Road.
Source: Shijiazhuang Public Security Traffic Police
- END -
Extraordinary ten years | High -quality cultural services allow the people to enjoy poetry and far away
Ms. Du, who lives in Yinzhuang Road and claims to be the post -80s over the age of...
National Health and Health Commission: 77 cases of cure for hospitalization in the new domestic diagnosis of new crown pneumonia on June 27
Xinhua News Agency, Beijing, June 28. The National Health and Health Committee rep...