Changchun New City Street Expressway (four -standard section) is completed in advance
Author:Jilin Daily Time:2022.09.11
On September 10th, Changchun New Town Street (four -standard section) undertaken by Zhongqing Group was completed in advance, becoming the first section of the traffic conditions, and realized the rapid connection of Changchun City, Jingyue District, Shuangyang District, and Yongchun area.
Changchun New City Avenue is the main road of the net month development zone, and the traffic demand is large. In order to complete the construction as soon as possible, the 700 Zhongqing Railway Army fought day and night for 300 days, and the kilometer "front" blossomed. During the construction process, the pile foundation adopts the pile head ring cutting process, the bridge pavement is built with a high band, and the telescopic joint uses a total of 13 lean construction in the standard section.
It is understood that Xincheng Street Expressway Project starts from Tianpu Road in the north and connects the extension of the East Expressway to the south. Long dual expressway project. The project started construction in June 2021. The construction content includes road engineering, bridge engineering, drainage engineering, transportation engineering, lighting engineering, and greening engineering.
Author: Jilin Daily All Media Reporter Wang Dan
- END -
Xiang Vocational Normal University Teachers and Students Go to the countryside to accompany left -behind children to spend the "colorful holidays"
Hubei Daily Client News (Correspondent He Linjie All Media Reporter Hu Mengsi) On ...
The funding is burning, Gu Tianle is out
The author of this article is the writer@本 永 本Lazy and eager, do not love labor...