Beijing Metro Lize Business District Station will transfer "five -line transfers"
Author:Beijing released Time:2022.09.10
On the north side of Lize Road, the construction of the Lizize City Terminal is underway. The reporter learned that the project is currently entering the cultural relic exploration stage. The Lize Business District Station where the terminal is located will become the first comprehensive hub in Beijing to realize the five -line transfer of subway.
At the end of last year, Line 14 of the Metro Line 14 was the first to open, becoming the first part of the "five -line transfer". In the future, the Lize Business District Station will also introduce Line 16, Daxing Airport Line to the north, and the planned Line 11 and Lijin Line.
According to the overall planning of the Daxing Airport Line and the supporting service facilities of Daxing Airport Line, the Lize Business District Station will set up a city market value machine building and transportation interchange center. Among them, Metro Line 14 and Line 16 are transferred to the "Ten" types. Line 14 is above, and Line 16 is below. Line 16 stations cross Lize Road, arranged north -south, and are underground island -style stations. Set up two -line shared station halls to form a single -cycle transfer mode of "platform to platform" and "station hall to station hall". However, due to integrated planning and other reasons, Line 16 will be suspended at the end of the year.
The North Extension Project of the Daxing Airport Line will further extend north to the Lize Business District, with a total length of 3.5 kilometers. In the future, the Lize Business District Station will become the terminal of the Daxing Airport Line at the urban area. It will mainly connect to the passenger flow from Line 14, Line 16 and long -term 11 to Daxing Airport. According to the overall planning and supporting service facility planning of Daxing Airport Line, the Lize Business District Station is positioned as the urban terminal, with rail transit transfers as the center, and the supporting settings of aircraft, luggage consignment and other aviation service facilities and supporting settings to set up taxis And social vehicles, connection buses and other traffic connection facilities. The Lize City Terminal will use the "urban living room" as the core design concept to return a large area of public space to the city and create a model of integrating the integration of the station city.
At present, the location of the Lize Business District is also the location of the city of Jinzhong. Previously, during the construction of Line 14, the relevant units had excavated the road ruins of the Lishemen in the Gold. Xing Zhaoyong, the manager of the 01 bid project of the Daxing Airport Line 01, introduced that the Lizer City Terminal Complex is currently undergoing cultural relic exploration. After the plan is stable and with the construction conditions, the construction of the overall terminal building complex will begin. In order to ensure that Line 16 was opened at the end of the year, the construction of Metro Line 16 has taken the lead. Among them, the structure of Line 16 of the Lize Business District Station has been completed. At present, the southern section of Line 16 has entered the cold slip test stage. (Source: Beijing Daily)
- END -
After the emergency plan of the tourist emergency plan, the city will do everything possible to provide tourists with rescue assistance
The reporter recently learned from the municipal government that the Emergency Pla...
Changsha Shengda Community: Popularize the knowledge of grain conservation and improve the awareness
Correspondent Liang WenqianIn order to further enhance the awareness of saving foo...