Broke in construction!Just tonight!Pay attention to this section of Shijiazhuang ~
Author:Yan Zhao Evening News Time:2022.09.09
Shijiazhuang City
Talking about Gudong Street (220 meters south of Yuhua Road)
Traffic Organization during the construction of drainage pipe renovation projects
Tan Gudong Street (220 meters south of Yuhua Road) was scheduled to start at 23:00, September 9, 2022 (Friday) at 23:00.
1. Construction time
September 9, 2022 23:00 to October 24th, 45 days;
2. Construction method and traffic organization
Take segmented interfering with construction method--
In the first paragraph, the current road of the siege of Gudong Street (Yuhua Road to Huanyu Road) was constructed. During the construction period, motor vehicles were prohibited from passing. Tan Gudong Street (Huanyu Road to Huaibei Road), the residents along the units of the units around Huaibei Road and Tan Gudong Street in and out.
In the second paragraph, the current road of the siege of Gudong Street (150 meters south of Huanyu Road) was constructed. During the construction period, motor vehicles were prohibited from passing. Tan Gudong Street (Huanyu Road to Yuhua Road), the residents along the units along the line by car, bypass Yuhua Road and talk about Gu Dong Street in and out. Tan Gudong Street (blocking the south to Huaibei Road), the residents along the line of the units around Huaibei Road and Tan Gu Dong Street in and out.
Source | Shijiazhuang City Public Security Bureau Traffic Management Bureau
- END -
Epidemic prevention and control volunteer service initiative
Volunteer and volunteer service organizations in the county:Faced with the current complicated epidemic prevention and control situation, volunteer service organizations and volunteers at all levels i
The year of work style 丨 repair the village's damaged roads, and try their best to do it for private affairs
After many years of wind and sun and the frequent crushing of past vehicles, the r...