44 closed -loop production enterprises in Chengdu opened the "epidemic prevention bubble" mode
Author:Cover news Time:2022.09.08
Cao Liqin cover news reporter Chen Yuanyang
Recently, the Sino -Metallurgical Western Steel Structure Co., Ltd., which is located in the Chengdu Kongtian Industrial Function Zone, has roar in the workshop, splashing welding flowers, and traveling back and forth. It is one of the companies that start the "epidemic prevention bubble" model in Jianyang City, Chengdu.
On September 8th, the cover reporter learned from the Propaganda Department of the Jianyang Municipal Party Committee of Chengdu, Sichuan, that during the prevention and control of the epidemic, the impact of the epidemic on enterprises was minimized by opening the "epidemic prevention bubble" model to minimize the impact of epidemic conditions on enterprises.
The steel components produced by the China Metallurgical Western Steel Structure Co., Ltd. support the construction and construction of multiple projects such as Jin Jianren Expressway across the Minjiang Bridge and Jiu Mian High Speed. In order to ensure the normal development of these projects, starting from September 1, the company launched a closed -loop production emergency plan and set up a special working group to comprehensively deploy, personnel management and control, prevention supervision, government -enterprise docking, environmental disinfecting, material preparation, etc. Management and control to ensure that the protection measures are in place and have full horsepower production.
According to the relevant person in charge of the China Metallurgical Western Steel Structure Co., Ltd., from September 1, in accordance with the requirements of the superior government on the prevention and control of epidemic and corporate closed -loop production, the closed -loop production plan was formulated. Coordination, realizing the company's nucleic acid testing, greatly avoids the contact between the company's employees and the outside world, and truly realizes "closed -loop production".
In addition, in order to maximize the "non -contact production" and improve production efficiency, the company enabled a series of factory and automated means such as steel structure pre -processing automation production line, automated welding robot, bridge board automatic welding system. Technology "reduces personnel contact and improve production efficiency, to ensure that the world's widest bridge with a width of 86.7 meters -Jin Jianren's first batch of 800 -ton steel components of 43,000 tons of steel components across the Minjiang Bridge can go smoothly in mid -September in mid -September Go to the factory to the site for installation.
"We arranged a special person to collect the demands of the enterprise, and went to the scene with the Municipal Economic and Information Bureau to verify the work of the company's" sixth in place "work. If they passed, they agreed with them to produce closed -loop production." Every enterprise arranged a special person to docking, the demands and requirements they put forward, and coordinated the relevant departments in a timely manner.
It is understood that in order to do a good job in the service work of closed -loop production enterprises, the Chengdu Air Tian Industrial Functional District Management Committee has set up two mobile detection points, which together with relevant departments, after the enterprise submits information that meets the closed -loop management, three "day" can be achieved. That is, on -site inspections on the day, approval of the day, and resumed production on the same day.
As of now, there are 44 closed -loop production enterprises, involving a total of 5090 closed -loop personnel. At the same time, the responsibility commitment was signed with closed -loop production enterprises to compact the responsibility of closed -loop production enterprises in normalized prevention and control, nucleic acid testing, health management registration, safety education and training and other aspects to ensure that the epidemic prevention and control and production and operation were correct.
- END -
Digital Motion News | September 5th Luding Earthquake Born in Xiangyang
Earthquake emergency at 12:52 on September 5thThe danger of natural disasters is ...
Today is the party's birthday.
In 101, the initial heart was like a Pan, and the mission was on the shoulders; in...