Enter Shandong today!

Author:Master Binzhou Time:2022.06.20

Before 2022, the Yellow River water adjustment of water and sand and sand work on the flood

Start on June 19th

Estimated

This time the Yellow River water adjustment process

Will enter Shandong Province on the night of June 20th

The maximum traffic of each major control station

Between 3700-4400 cubic meters per second

Notice of the Office of the Flood Control and Drought Resistance Headquarters in Shandong Province

Relevant units at all levels shall accord

Make sure this time of water adjustment

Flood control safety in the Yellow River Shandong section

The notice requires that the responsibility for flood prevention should be implemented. Relevant units at all levels should attach great importance to the people's first and life -supreme people, strictly implement the various flood control responsibilities systems with the responsibility system of the executive head, in accordance with the requirements of the flood defense, timely work in place, strengthen emergency duty, and serious flood prevention discipline. Effectively grasp, pragmatic, and position in various tasks.

We must do a good job of inspection and rescue. Strengthen the inspection and defense of the Yellow River flood prevention project and the beach area, increase inspections on the changes in the river, low -lying beach areas, key projects and weak links, increase inspections, encrypted the frequency of inspections, pre -preset flood control materials in advance, and discover dangerous situations. Get in time to ensure the safety of the project and the safety of the beach area.

Be prepared for the masses in the beach area. In accordance with the emergency plan of the personnel transfer and resettlement of the beach area, do a good job in the preparation of the threatening the masses in the low -lying area of ​​the beach area, formulate a corresponding transfer resettlement plan, and implement the transfer of transfer resettlement measures and rescue forces in advance to ensure that the personnel of the beach area can be withdrawn and settle well. And stable.

It is necessary to strengthen the pontoon bridge and water -related safety management. At all levels, it is necessary to strengthen the safety management of the pontoon bridge, urge the pontoon management unit to demolish the pontoon in a timely manner and do a good job of the floating boat anchor. Depending on the flood warning information in a timely manner, a warning signs are set up in the prominent location and beach area of ​​flood prevention projects, water conservancy scenic spots and beach areas, and urging the water -related operations and engineering inspectors to do the necessary protection measures to ensure the safety of personnel.

We must strengthen information submission and publicity. Strictly implement information submission regulations, and timely and accurately submit emergencies. It is necessary to comprehensively and accurately report the work before the flood, and create a good atmosphere of public opinion.

Source: Volkswagen Daily, Qingdao Daily

Edit: Zhang Li

- END -

Guangdong rural rejuvenation creates "one village, one song", "one grade and one song" characteristic brand

Text/Yangcheng Evening News all -media reporter Xu Yue intern Zheng NanHakka Song songs evoke nostalgia, Xiangyun ancient rhyme sings to revitalize, Guangfu salted water song describes a happy life, a

Li Hongen, Sichuan Vocational and Technical College of Sichuan: Locomotive Award winner, dreamer of the plateau in the plateau

Cover Journalist Zhu Xingzhi intern Xin QilinSichuan Vocational and Technical Coll...