Two days of construction!The road upgrade project of Shijiazhuang City started on the evening of the 9th
Author:Hebei Radio and Television Sta Time:2022.09.07
Ji Shi Client reported (Jia Yigang, a correspondent in Duyanqing Wang Yan, Hebei), Shijiazhuang City (Heping Road to Guanghua Road), Shijiazhuang City (Heping Road to Guanghua Road).
Construction time: September 9, 2022 23:00 to September 28th, the construction period is 20 days;
Construction method and transportation organization: take half a construction and half -passing method, first construction in the east of the east, and then half of the construction.Through the north, the remaining half of the road from the north to the south, the non -motor vehicles and pedestrians are mixed on both sides of the lane. The parking spaces on both sides of the construction section are canceled and the motor vehicle is prohibited.Ensure that Yuhua Road and Zhai Ying Street are interconnected in the east and southwest of Zhai Ying Street, and the exit of Guanghua Road and Zhai Ying Street.
- END -
The sunflower sea in the north bank of the Jinan Yellow River ushered in the flowering period
On September 11th, in the Yellow River ecological landscape in the start area of t...
Sad!Within a week, 13 people died and 1 disappeared!
June 26Lingao County, Hainan ProvinceDrowning accident (Video source network)It ...