The main body of the Xishan Mining Bureau Station of Taiyuan Metro Line 1
Author:Smart Life News Time:2022.09.07
The newspaper (Reporter Ding Yuan Correspondent Li Yajie) The Taiyuan Rail Transit Line 1 Xishan Mining Bureau, which was led by China Railway Construction Investment Group and undertaken by China Railway 16th Bureau Group, was capped.
Xishan Mining Bureau is located on the west side of the intersection of Ximing Street and Heilong Bay Lane in Wan Berlin District, Taiyuan City. It is the starting point of the first phase of the Taiyuan Rail Transit Line 1.The station is 459.92 meters in length and 21.3 meters wide to 37.14 meters wide. It uses the second floor (partial layer) single -pillar and double span (partially adopts double -pillar three spans, three columns and four spans).Arranged.
The number of pipelines around the station is large, intensive, and difficult to relocate. The north side of the construction site is closely attached to the North North District and Park New Residential Community, which is only 5.6 meters from the nearest residential building.Facing multiple tests such as complex geological and changing weather, the construction team carefully organizes, continuously optimizes construction processes, safety production measures, etc., fully deploy construction resources, strictly control the connection between various processes, and successfully complete node goals.Source: Shanxi Daily
- END -
On the day of Teacher's Day, the "National Outstanding Teacher" street joint security to save people
Wuhan Evening News September 10th News On September 10th, Teacher's Day, a woman a...
The auditors of the hot sun are not afraid of "baking" inspection
Recently, Baokang turned on the barbecue+steaming mode. The mobile phone text mess...