Notice!Residents in this area remember to save water!

Author:Harbin Daily Time:2022.09.07

The reporter learned from the Harbin Water Supply Group that due to the construction of the water supply pipeline project at the intersection of Pioneer Road and Chemical Road, it is necessaryFrom the east to the chemical road, the Binbei Railway in the west, the Yangtze River Road from the south, and the north to Xianghua Street, the users were stopped to stop the water, and the surrounding area was reduced.

During the water shutdown, the majority of users reserve daily water use, and it is expected to restore water supply in advance. Please close the faucet.

Source: Bingcheng+Client

Reporter Wang Dan

PSAs

- END -

Relay "Sun" | Jiyu Village, Mao County, Sanyuan Demonstration Village, Aba Prefecture

Happy Home Relay SunPure Land Aba, I XingIntroduction to Jiyu VillageFengyi Town J...

Su Bingtian Xie Zhenye prepared for the track and field World Championships

According to the opening of the Xinhua News Agency, the opening of the Oregon Track and Field World Championships is still two days. Chinese players hurry up on the 13th for the final training. Su Bin