Calling and transformation from September 10!Wind this way →
Author:Xiamen Daily Time:2022.09.06
Starting at 00:00 on September 10, the elevated bridge node of the South Road of Haixiang Avenue Lane is closed and transformed. Yesterday, the traffic police detachment released the traffic control during the construction period. It is understood that the renovation of the node is expected to carry out five months, until February 10, 2023.
According to reports, after the renovation, the cross -line bridge at the intersection of Laoshan South Road is promoted, and the cross -line bridge at the intersection of the new lanes (4.0 meters high in the back bridge is 4.0 meters). The late viaduct will be continuously across the Shannan Road, Lane South Road, and Xiang'an East Road.
During the construction, the construction of the road in the center of the road in Haixiang Avenue, Xiang'an District was closed. Restricted motor vehicles, please bypass the surrounding roads such as Haixiang Avenue, Lane South Road, Xiangyue Road, Xiangming Road, Zeng Wu Road and Xiang'an East Road. Xiang'an District Haixiang Avenue's Qianshan South Road is closed in the middle of the road. For limited motor vehicles, please detour around Haixiang Avenue, Lane South Road, Xiangming Road, Xiang'an Dong Road and other surrounding roads.
"The main influence is the South Road of the Lane. This road is the main road of traffic in the traffic of new stores and Malaysia. It reminds that citizens who often follow this road planned the travel route in advance."
(Text/Xiamen Daily reporter Ke Kaiyu Correspondent Jiao Xuan)
- END -
Green Camp Boom Ke Wenzhe's 5 major political opinions jumping and jumping. Ke Fang responded: Do n’t election, you will be full of political calculations
Taiwan Strait.com June 29 (Zhang Wei/Organization) Comprehensive Taiwan media repo...
Normal activity shows the colorful non -heritage of Sichuan
Watch the puppets, listen to Sichuan opera, taste non -heritage food, experience l...