Has been opened to traffic!See if this line has passed by your home?

Author:Chongqing Satellite TV Time:2022.06.20

Our Chongqing Line 4 Phase 2 is finally opened

Both fares and operation hours are announced

Hurry up and see

not

Operating timetable

not

not

Chongqing

The initial operation time of Chongqing Rail Transit Line 4 is 06: 30-22: 30, that is, 6:30, the closing time is 22:30. 16 train (including 2 straight fast) online operation.

Picture source: Chongqing Daily

not

not

Station and transfer

not

not

Chongqing

Chongqing Rail Transit Line 4 is an important line for Chongqing to complete the "eight lines and one ring one ring" basic network construction of urban rail transit, with a total length of about 32.8 kilometers.

Site: There are 15 stations across the board, including 5 elevated stations and 10 underground stations. Sheng Station, Sanshixi Station, Longyi Avenue Station, Longxing Station, Gaoshi Tower Station, Pufu Station, Tongzilin Station, Shipping Station, Huangling Station.

Transfer: Transfer on the entire line and three rail lines, transferred to Line and Dragon Post Avenue Station and Planning Line 8, Du Sheng Station and Planning Line 15, respectively. Essence

not

not

fare

not

not

Chongqing

The official website of the Chongqing Development and Reform Commission

The fare was announced on January 26, 2022

As shown in detail below

Rail Transit Line 4 (Tieshanping -Huangling) fare standards are implemented in accordance with the standards of the operation of rail transit lines.

That is: starting price of 2 yuan [0-6 kilometers (inclusive)], 3 yuan [6-11 kilometers (inclusive)], 4 yuan [11-17 kilometers (inclusive)], 5 yuan [17-24 kilometers (inclusive) ], 6 yuan [24-32 kilometers (inclusive)], 7 yuan [32-41 kilometers (inclusive)], 8 yuan [41-51 kilometers (inclusive)], 9 yuan [51-63 kilometers (inclusive)],],]], include], including 51-63 kilometers (inclusive)],,], include],] 10 yuan [above 63 kilometers].

Picture source: official website of Chongqing Development and Reform Commission

not

The preferential treatment policy implemented by Rail Transit Line 4 (Tieshan Ping -Huangling) is consistent with the relevant policies of the running rail transit lines.

Rail Transit Line 4 Phase II was officially opened to traffic

Connect the two rivers of the two rivers

Yufu New City and Longxing New Town

Promote the group of Tang Jiayu, Yufu Longxing, Yuelai and other groups

Local development with other regions

Are you ready to get rid of the car

not

- END -

Urgent reminder!In many places, 7 people have died as a result

ReminderrecentlyInner Mongolia, Shandong successively happenedDrunk driving causes...

Pocket Park dressed as a beautiful people's life

Pomegranate/Xinjiang Daily reporter Wang YayunI will go to a batch of flowers and trees at night, and I need to stare at 12 o'clock. In the past few days, the high temperature close to 40 degrees ha...