The picture is shocking!Huangpi Qianchuan Line 1st Phase I was paved

Author:Changjiang Daily Time:2022.06.20

On June 20, with the last set of rails of the Dragon Avenue interval of the Wuhan Metro Qianchuan Line — Dragon Avenue, the first phase of the Qianchuan Line achieved the entire line of "rail connection", which is the follow -up "Dentaga", "Communication", "Comprehensive"Local nodes such as joint testing "will lay the foundation on schedule.The first phase of Qianchuan Line extends from the North Station of Line 7, and passes 7 seats such as Maichi Station, Tangyunhai Station, Dragon Avenue Station, Tenglong Avenue Station, Tianyang Road Station, Linkong North Road Station, Hengdian Stationstation.After completion, it will bring great convenience to the travel of the residents of Qianchuan, Hengdian, and Panlong City.

The first phase of the Qianchuan Line realizes the entire line of "track".Reporter Li Yonggang Photo

The rails laid the scene.Reporter Li Yonggang Photo

Placed tracks.Reporter Li Yonggang Photo

The construction personnel handle the surface of the lane bed that has been completed.Reporter Li Yonggang Photo

The last set of rail rows is accurately laid in place.Reporter Li Yonggang Photo

The last set of rail rows is accurately laid in place.Reporter Li Yonggang Photo

【Edit: Zheng Xiaoxiao】

For more exciting content, please download the "Da Wuhan" client in the major application markets.

- END -

The Ministry of Agriculture and Rural Affairs sent a working group and the technology team to guide drought -resistant summer species to promote summer management

Xinhua News Agency, Beijing, June 19 (Reporter Yu Wenjing) Recently, most of Huang...

The "Net Red Village" in South Xinjiang is happy in the "Poetry and Far"

On the hot summer, under the grape rack of the farmhouse of the desert oasis village, you enjoy the brightened grabbing rice and hot barbecue, and a cup of cool Kavas (Xinjiang local specialty drinks)