It will save about 15 minutes of drive!Tong'an Hub Station to Xiamen North Station BRT New Line is expected to open at the end of the year
Author:Xiamen Daily Time:2022.09.04
The BRT viaduct project of "Together with Right to the North of Xiamen" is under construction. It is planned to start the steel box beams in October. It is expected to be completed in December this year.This means that the "Tong'an Hub Station-Xiamen North Station" BRT new line is expected to open at the end of this year.
"Together with the right direction of Xiamen" BRT viaduct project is an important part of the Jimei Bridge Bridge Traffic Transformation Project.The BRT viaduct is 247 meters in length and connects the Binhai West Avenue BRT viaduct and the Lehai Road BRT viaduct. It is an important public traffic channel for Tong'an BRT to reach Xiamen North Station.
According to reports, after the project was completed, the new line of "Tong'an Hub Station-Xiamen North Station" was planned to open at the end of this year.At that time, taking BRT from Tongan to Xiamen North Station, it is expected to save about 15 minutes.
(Xiamen Evening News reporter Lin Shan)
- END -
At 00-8 on September 3, a newly added infection of Hangzhou was added to detect the normalized nucleic acid testing and found
Source: Hangzhou PublishedThe copyright belongs to the original author, if there is any infringement, please contact it in timeAt 00-8 on September 3, a newly new crown virus infection was added in Ha
Optimize the business environment, the new scene is here!
Production and operation for enterprisesPassing point, pain point, attacking point...