State Grid Sichuan Electric Power Measurement Center: Concentrate to protect Wanjia's lights to ensure that residents' users are not interrupted

Author:Chengdu Daily Jinguan Time:2022.09.04

"From September 1st, residents users with insufficient balance in Chengdu in the collection system have given priority to the remote power preservation task. As of 9:00 on September 4, the power guarantee was successfully issued by 505,900 households." State Grid Sichuan Electric Power Measurement Center collection Wang Jiaju, the staff of the system operation management, said when reporting to the marketing department of Sichuan Company.

Since the end of August, as soon as the high temperature period is over, Chengdu has once again encountered a severe test of local new crown pneumonia. In the face of difficulties and dangers, the State Grid Sichuan Electric Power Measurement Center overcome difficulties, adhere to posts, adhere to responsibilities, and use sweat and pay to practice the service tenet of the "people's electricity industry for the people".

The collection system, as a first -level information system for electricity users in the province, is an important guarantee for the province's anti -epidemic and power supply. After Chengdu issued a notice for the test of nucleic acid testing throughout the city, the State Grid Sichuan Electric Power Measurement Center immediately launched an emergency response plan for the collection system. The emergency working group of the collection system was established during the epidemic period. Composition with the system operation and maintenance manufacturers, adopt AB -corner rotation without meeting, home office, and off -site on duty. It is carried out for 24 hours.

In response to the current situation in Chengdu, after receiving the work requirements of the marketing department to ensure that residents' power supply is not interrupted, the emergency work team formulated a long -range electricity guarantee plan for residents as soon as possible, and a total of 90.401 million users in Chengdu carried out the balance. Situation monitoring, remote electricity implementation and other work. According to reports, the State Grid Sichuan Electric Power Measurement Center will continue to pay close attention to the dynamics of Chengdu's epidemic, ensure the stable and efficient operation of the collection system, and contribute to ensuring the smooth operation of the city.

Chengdu Daily Jinguan News Zhang Ran reporter Yang Su is responsible editor He Qixie Editor Liu Yonghao Picture State Grid Sichuan Electric Power Measurement Center provided

- END -

Qu Zhe: For the people, "build" a good life asylum

Qu Zhe, deputy director of the Institute of Earthquake Engineering, Institute of E...

Jingwang 2022 was deceived 700,000, only because of a pot!

In May of this year, Ms. Ganzi Xinlongyi (pseudonym) encountered order fraud in or...