Zengcheng in Guangzhou: The construction project of Lixiang South Road and Jinzhu West Road is completed!
Author:Zengcheng District Rong Media Time:2022.09.04
Improve the urban livable environment! Recently, the two municipal projects of the construction of the construction project of Lixiang South Road and Jinzhuxi Road in Zengcheng District, Guangzhou City, and the 110kV high -voltage line of Zengcheng Plaza were completed one after another.
The construction project of Lixiang South Road and Jinzhu West Road is one of the key projects of Zengcheng District. Both Lixiang South Road and Jinzhu West Road are designed according to two -way four -lane supporting two -wheeled lane. The design speed is 30 km/h. From the beginning of Lixiang South Road, Lixiang Road intersects with Guangshan Highway. The end point is connected to the status quo Lixin Highway, and it is moving north to south. The planned red line width is 30m and 770.14m in length. The starting point of Jinzhu West Road is connected to the Lilin Highway, and the end point is connected to Lixiang South Road. The planned red line width is 24m and 393.48m long. The main construction of the road includes projects such as roads, transportation, lighting, drainage, water supply, greening and other projects. At present, the construction project has been fully completed, which not only improves the construction of regional road networks, eases the pressure of surrounding traffic, has also beautified and optimized the surrounding environment, and further enhances the level of urban landscape.
Aviation Picture of Lixiang South Road
The renovation project under the implementation of the 110kV high -voltage line around Zengcheng Plaza aims to cooperate with the integrated renovation project along the roads such as Jinzhu Avenue and Lixin Highway to remove the original viaducts (Jinzhu Avenue, Guangshan Highway, Lixin Highway), which is about 8.6 kilometers long. Essence The new ground cable pipe trench is about 8.7 kilometers long and 2 meters wide (Fuyou Road, Xiajie Avenue, Xincheng Avenue, Aimin Avenue, Lixin Highway and Zengcheng Avenue). A new high -voltage line terminal tower is built, and one new tower is built. The completion of the project is conducive to the development of land along the route, drives the construction of roads in the area, and accelerates the construction of the area around Zengcheng Plaza. At the same time, the continuous improvement of municipal facilities has effectively enhanced the city image of our district, improved the living environment, and improved the quality of life of citizens.
Next, the Housing and Construction Bureau of Zengcheng District will closely close the target and key nodes, the inverted work date plan, and optimize the construction organization. In the future, it will accelerate the overall planning of various municipal and housing construction projects under the premise of ensuring safety and quality. The high -quality development of the urban area provides stamina.
Source: Chen Yingshi, a reporter from Zengcheng District Housing and Urban -Rural Development Bureau, Zengcheng Rong Media Center
- END -
Entry courier fragrance?Originally hidden endangered wood species!Xiamen Customs Reminder →
▲ Xiamen Customs seized 1.7 kilograms of agarwood in the entrance express. (Photo...
Nanyang: Improve the level of supervision
On September 7, Chen Yingjie, member of the Standing Committee of the Nanyang Municipal Party Committee, Secretary of the Municipal Commission for Discipline Inspection, and Director of the Municipal