Fu Sheng Town, Yuecheng District, Shaoxing City: "Party building and creation" adds to the creation of Mei Town

Author:Zhejiang City Radio and Televi Time:2022.09.02

"My mobile signal is full! The scenery of the casual shot will be passed out immediately." Ms. Guo said happily in the starry sky camping site in Wudingling. Recently, Shaoxing's first pure solar wind energy power supply and communication base station, Yuecheng Wufengling Solar Base Station, was successfully opened. Many villagers and tourists feel the happiness of "Mange".

Wufeng Ridge, Jinxi Village, Fusheng Town, is a hot Internet celebrity punch point in recent years. However, due to the complex terrain, the communication infrastructure has difficulty in power, and the mobile communication signal is weak. Representatives of the district and town -level National People's Congress have repeatedly suggested to strengthen the mobile communication network signal in the Wufengling area. Many villagers and tourists have also made suggestions and suggestions to enhance the communication signal. To this end, in June of this year, the People's Government of Fusheng Town issued a letter to the China Mobile Communications Group Zhejiang Co., Ltd. Yuecheng Branch, hoping that China Mobile Yuecheng Branch can help Jinxi Village, Jinxi Village, Fu Sheng Town to strengthen infrastructure construction and strengthen the coverage of communication signal. Assist in the digital construction of Wufengling Scenic Area.

After receiving the letter, China Mobile Yuecheng Branch conducted on -site investigation for the first time. After investigation, it was found that because the on -site was a mountain stone road, the total length of the electric line was over 3 kilometers. There are no rod roads along the road, and the budget for buried land has exceeded the standard, and due to the long distance, the voltage voltage drop is too large, and the equipment operation needs cannot be met. After many communication and coordination and implementation of the two parties, on August 9, the Five Peak Ridge solar base station in Yuecheng was successfully opened. The on-site signal was raised from -110dbm to -79dbm to achieve full signal.

image.png

It is worth mentioning that the base station is Shaoxing's first pure solar wind power supply communication base station. The current it generates can not only supply power to the two base stations, but also can store power to ensure that the base station can still ensure power supply for 25 hours in a special environment. As of now, all 13 mobile 5G sites and 33 5G sectors planned by Fu Sheng areas have been opened, and the signal of the administrative village of Fusheng Town has been fully covered.

Supply unit: Meili Town Office of Yuecheng District

Correspondent: Zhang Baimei

- END -

The average annual temperature of my country's watches rises significantly

Beijing Evening News (Reporter Luo Qianwen) Yesterday (3rd), the China Meteorological Administration held a August press conference and officially released the Chinese Climate Change Blue Book (2022)

The National Development and Reform Commission's Notice on Printing and Distributing the Work P

The National Development and Reform Commission's Notice on Printing and Distribut...