Henan Luohe: 158.6 kilometers of drainage pipeline network "physical examination" to do the real city "Lizi"
Author:China Construction Magazine Time:2022.09.02
On September 1, the drainage pipe network testing team organized by the Municipal Construction and Public Service Center of Luohe City, Henan Province, is using robots to enter the underground drainage pipeline for detection. In the dredging pipeline Pipeline conditions, accurately collect professional data such as tube length, pipe diameter, well depth, and ensure the safety and smoothness of urban drainage through the face -to -face "physical examination" of the drainage pipe network.
Municipal personnel are debugging and detecting robots
It is understood that in order to accelerate the shortcomings of the collection and treatment facilities of urban sewage, the full coverage, collection, and full treatment of the sewage pipe network as soon as possible, eliminate the black and odorous water body, and ensure the goal of "long -term treatment of long -term treatment" in water bodies. In accordance with the arrangement of the Municipal Party Committee and Municipal Government and Municipal Urban Management Bureau, the municipal construction and public service centers will organize and implement the supporting project (second standard section) of the urban sewage treatment pipeline network in the urban area. The drainage pipe network, fully dredging and dredging, check the function of the pipe network, transform the pipe network error connection, mixing, and damage, etc. The pipe network improves the water inlet concentration and life collection rate of sewage treatment plants.
Municipal personnel are cleaning the pipe network silt
At this stage, the drainage pipe network is conducting dredging and testing. The scientific organization of the municipal center scientifically organized 16 class to pass the testing team at the same time, and rationally used machinery and equipment such as mud cars, large dirt absorption vehicles, high -pressure flushing cars, and detection robots. The replacement of manual testing has played an important role; at the same time, it also strictly implements the requirements of various safety operations, arrange special personnel on -site quality supervision to ensure that the pipeline network is dredging, the data collection is detailed, and the construction is safe and orderly. At present, more than 50 kilometers of drainage pipe network have been cleared, and a comprehensive "medical examination" is expected to be completed by the end of October.
Municipal personnel use the subtra level to view the situation of the pipe network
The relevant person in charge of the Municipal Construction and Public Service Center of Luohe City Urban Management Bureau of Henan Province stated that the next step will also actively plan to gradually clear and detect the road drainage of roads under the jurisdiction. The information system (GIS) realizes the informationization and bookization management of drainage pipe networks, further improves the basic information of the drainage pipe network, comprehensively improves the efficiency of the urban drainage pipe network system, and provides a strong guarantee for urban green, ecological and sustainable development. (Correspondent Liu Yilong)
- END -
Autumn is high and refreshing, Ziwei competes for gorgeous
The Yangtze River Daily Da Wuhan Client September 2nd News On September 2nd, nearl...
Jinan Zhangqiu: The great era of promoting cadres' work style
In order to thoroughly implement the major work deployment of special action to im...