latest news!The Ganlong Railway is resumed to traffic, and some train resumes to the run
Author:Xiamen Daily Time:2022.06.19
At 8:16 on June 18th, nearly a thousand people over a thousand people had been repaired by nearly a thousand people in the railway department. The reasons for the reasons for water damage were resumed to traffic.
From today, some trains of the Gan Ruilong Line have resumed. The specific trains include: Chengdu East-Xiamen North G2371 times, Changchun-Xiamen North Z103 times, Ganzhou-Shanghai Hongqiao D3147 (Xiamen North Station), Ganzhou-Xiamen D6583, and Xiamen D6583, and Xiamen D6583, and Xiamen D6583, and Xiamen D6583, and Xiamen D6583, Xiamen D6583, and Xiamen D6583, and Xiamen D6583, Xiamen D6583, and Xiamen D6583, Xiamen-Ganzhou D6582 times, Fuzhou-Ganzhou D6578 times (suspension of Xiamen North Station), Xiamen-Ganzhou D6584 times, Nanjing South-Ganzhou D3138 times (Sound Xiamen North Station), Xiamen North-Chengdu East G2372, Xiamen-Ganzhou-Ganzhou-Ganzhou-Ganzhou-Ganzhou-Ganzhou-Ganzhou-Ganzhou-Ganzhou-Ganzhou-Ganzhou D6478 times, Xiamen-Wuhan G2294 times, Fuzhou-Pingxiang North G5066 (after parking Xiamen North Station), Xiamen North-Beijing West K572 train.
In addition, there are some trains from Ganzhou Station to Ruijin Station. The specific trains include: Ganzhou-Xiamen D6581 is changed to Ruijin Station at 8:32, and at the same time, Ganzhou Station to Ruijin Station was suspended. Ganzhou-Fuzhou D6577/6 times (stopped by Xiamen North Station) was changed to 8:58 from Ruijin Station. At the same time, it was suspended from Ganzhou Station to Ruijin Station.
It is understood that the China Railway Nanchang Bureau Group Co., Ltd. closed the Ganlong Railway in a timely manner before the occurrence of water damage and stopped the train. It was launched to inspect the danger of the landslide of Jinfeng Mountain to Changting Road, which effectively prevented the possibilities of major train water harm accidents. After the water damage occurred, China Railway Nanchang Bureau Group Co., Ltd. and Longyan County two -level local governments, China Railway 24 and 10 innings and other engineering units were closely strengthened, and nearly a thousand people such as construction, labor, power supply, driving, and signals formed rescue After more than 4 days, the team fought for more than 4 days and completed the rescue task more than two days in advance.
(Xiamen Evening News reporter Lu Jiajie)
- END -
Zhang Lei went deep into the front line of the highway project to carry out the practical activity of "lower grassroots, inspecting the people, relieving the people's concerns, and warming the people's hearts"
On June 24th, Zhang Lei, secretary of the Party Committee and Director of the Prov...
Guangzhou Disease Control: Zhuhai and other places (Return) Sui, please report immediately
Text/Yangcheng Evening News all -media reporter Lin Qingqing Correspondent Sui ZhuanzhuanOn the evening of June 20, Guangzhou Disease Control Reminder reminded: Since June 12, there have been Zhuhai H