my country's first cross -sea high -speed railway spreads through the line
Author:Xinhua News Agency Time:2022.08.30
On the morning of August 30th, at the construction site of Xiamen North Station, Xinfuxia Railway, with the successful layout of the last set of 500 meters long rails, my country's first cross -sea high -speed rail -Xinfu (State) Xiamen (Gate) Railway Lauret was connected throughout the line. Essence
According to the relevant person in charge of the China Railway Nanchang Bureau Group Co., Ltd., due to the complex hydrological environment and high risk factor, there are three difficult construction locations in the entire line of the Fuxia Railway.Cross -sea bridge.To this end, the construction unit adopts the domestic advanced two -tier rail paving operation equipment, and the long -sized rails on the left and right lines are laid at the same time, which is 60%of the operating efficiency of 60%compared to the traditional rails.The railway opens a solid foundation on schedule.
It is understood that the design of the Fuxia Railway is 350 kilometers per hour, and the main line is 277.42 kilometers. There are 8 stations on the entire line.After the railway is completed and opened to traffic, Fuzhou and Xiamen will realize the "one -hour life circle", and the "Golden Triangle" of Xiamen, Quanzhou, and Zhangzhou Fujian will form a half -hour traffic circle.(Reporter Zhou Yi, Lin Shanchuan)
- END -
Shanghai will openly open the catering hall food
Xinhua News Agency, Shanghai, June 26 (Reporter Zhou Rui) The reporter learned fro...
The wedding industry person who bought a vase was required to "return the goods for seven days without reason" and was rejected by the court
A wedding industry practitioner spent 5,800 yuan online shopping for 60 vases. Aft...