Yongjin Zaoyuan Coal Industry: The renovation of the auxiliary transportation system is successful
Author:Yuzhou Rong Media Center Time:2022.08.30
"The display function of the split -type operation desk is more complete than before, and we are more convenient to operate ..." Recently, in the juvenile coal industry ground orbital twisted room, the twist driver Li Lijuan introduced to the author.
For more than a month, all the cadres of the mine have both day and night. They have been instructed in front of them and paid an eye on the scene. Each production equipment manufacturer has also trained in depth to guide the installation. In the end, after testing by the Mineral Inspection Center, the indicators of the two -level improvement machine detection of the mine met the requirements of the indicators and had heavy load operation conditions, which marked the successful success of the mining assistance to the operation and transformation.
It is understood that in order to solve the problem of high -quality development bottlenecks in the mining auxiliary transportation, the mine invested nearly 10 million yuan to transform the two -level improved aircraft. The roller elevator was replaced with a 3M single drum improvement machine. The dual -code increase of the orbit oblique well and the dual -coding well of the orbit was changed to a single code increase, which effectively solved the problem of insufficient width of the lane lane.
After the auxiliary transportation system is transformed, the overall transportation capacity of the mine has been further improved. The original bracket needs to disintegrate the ground, and the underground is re -assembled. There are many process links, many employers, and a certain number of hidden safety hazards. The efficiency of the bracket installation is severely restricted. After the transformation, the bracket can not only achieve "one -stop" transportation Provide security assurance. At the same time, after the formal investment of the two -level elevator, it can realize the improvement of the weekly planning class, save a lot of human resources, and improve the essence and safety level of oblique alleys.
In the new twisted, the mine will completely eliminate the adverse factors that restrict the safety of mines such as insufficient system capabilities, further improve the operating conditions of employees, improve the safety of transportation lines, and ensure the safety, efficient, and orderly advancement of mines. (Correspondent: Tian Chaojun Lin Hehui)
- END -
The Ministry of Water Resources has launched a flood defense level IV emergency response for 8 provinces including Shandong
The Ministry of Water Conservancy launched a level IV emergency response to 8 provinces such as Beijing, Tianjin, Hebei, Shanxi, Inner Mongolia, Shandong, Henan, and Shaanxi.According to the flood sit
Mo Xiang loves love!Fuhai Street Acropolis community Pen Ink Passion Pour the Flowers of National Unity
Yunshi News (Reporter Li Liping Intern Reporter Liang Shuang) Calligraphy is an ex...