There are 33 land supply, and the total price of the starting price is about 18.965 billion yuan.
Author:Qingdao Evening News Time:2022.08.30
The Liaoyang Road Bai'anju Land Inn and others have closed the store.
The current situation of Lady Place, Nanjing Road.
In order to strengthen the guarantee of factors, promote the implementation of the project, optimize the business environment, and stabilize the market expectations, according to the deployment of centralized supply of residential land in 2022, the municipal land reserves and consolidation increase and increase the land collection, storage and supply, and make every effort to do a good job of the third batch of the city in our city. Concentrate the land supply and issue a transfer announcement at the expected point. In the third batch of concentrated land supply, multiple plots have attracted much attention from the public. Among them, the "experience" of the No. 1 plot of Nanjing Road is the most abundant. After adjusting the nature of the land last year, the land transfer of the land in the gold area is expected to be transferred to the land. Get "new life".
The third batch of concentrated auctions for residential land in Qingdao City is issued. It is scheduled to hold an online transaction event in the online transaction system of the state -owned construction land use rights in Qingdao from September 15th to 16th. There are 33 land concentrated supply of land, with an transfer area of about 1538.66 acres. The planned construction area is about 2.3744 million square meters, and the total price of the starting shooting is about 18.965 billion yuan. Among them, there are 14 land concentrated land in the city, which are located in Shinan District, Shibei District, and Licang District. The existence land area is about 780.35 acres. The planned construction area is about 1.3495 million square meters.
In terms of bidding rules, the third batch of soil auction policy continues the new high -quality commodity residential policy at the end of last year, that is, when the local bidding quotation reaches or exceeds the highest price limit, the bidding for online land is suspended and transferred to the offline offline to offline. The construction link of high -quality commodity residences (including green buildings, intelligent infrastructure configuration, and prefabricated buildings). At the same time, land supply and distribution policies have also continued the requirements for cancellation of property rights apartments. Some plots allocated public rental housing, affordable housing, resettlement houses, and educational houses.
The reporter sorted out and found that from the perspective of the third batch of transfer of land, there were 2 cities in the South District, 4 in Shibei District, 8 Lishan District, 1 in Laoshan District, 5 in Chengyang District, 1 high -tech district, and the west coast of the West Coast. 12, Li Cang and the West Coast have become the main force of the land auction; from the auction time, the city south, city north, Li Cang, and Chengyang land auctioned on September 15th. The auction on the 16th, the auction lasted two days; from the quality of the land, the supply of the core area of the urban area in this soil auction increased, and there were many high -quality plots. Compared with the 15 and 27 of the previous two times, the number and quality of this soil auction supply plot have reached a record high.
The most noticeable is the No. 1 Nanjing Road and No. 52 and No. 52 Land of Nanjing Road, which are launched by Shinan District. In recent years, there are few new residential plots in Shinan District. Among them, the total construction surface of the No. 1 land in Nanjing Road is 89062.38 square meters (residential 40078.07 square meters, business finance 48984.31 square meters, and the starting price of the floor is 12665 yuan/square meter. The total price of the starting shooting is 1.128 billion yuan, and the bidding deposit is 564 million yuan.) 50238.65 square meters of No. 52 and No. 52 Hong Kong West Road (15071.6 square meters of residential houses, commercial finance 35167.05 square meters, and the starting floor price is 15190 yuan// Square, the total price of the starting shot is 763 million yuan.) Guanhai News/Qingdao Evening News reporter Xu Meizhong
Liaoyang West Road Bai'anju Land quickly launched idle for many years, Nanjing Road No. 1, looking forward to freshmen
Many of the plots of this transfer are well known to the citizens. Among them, the Liaoyang West Road Bai'anju plot, because of the news of the sports brand Decathlon closed store, has been watched by many citizens. In the transfer announcement, the plot is located south of Liaoyuan Road, west of Fuzhou North Road, and north of Liaoyang West Road. It is a land for commercial and residential. The living atmosphere is strong and has a certain geographical customers.
In order to allow the plot to be transferred as soon as possible, the Municipal Ecological Environment Bureau involved in advance, arranged special personnel to track services, organized technical forces to analyze and judge the soil pollution status of the plot, carry out assistance and guidance, speed up the progress of soil pollution, and improve the quality of investigation. In order to open the green review channel for the investigation report, all the investigations and review work were completed on August 20. After the review, the non -polluting plot was considered to be used for development and construction. In order to thank the ecological environment departments for the rapid service, the director of the Qingdao Central Business District Management Committee cared about Hong Hong specially giving away the "enthusiastic service to promote development, accurate and efficient solutions to the problem" flag, and the survey and review of the soil pollution status of the ecological environment departments in the Bai'anju City Renewal Project was rapid Thanks for high -efficiency service.
On the afternoon of the 29th, the reporter came to the land and found that some of the Liaoyang West Road in front of the project was surrounded by construction, leaving only one road in and out. When the reporter wanted to enter the interview, he was stopped by security personnel at the door. "In front of the door is the subway station. There are two main roads on both sides of Fuzhou Road and Liaoyang Road, and the north side is a mature Liaoyuan Road food street. The surrounding area is very mature." The completion of roads and subway line 4 will be further displayed.
In the transfer of land, the most bumpy fate is the No. 1 plot of Nanjing Road. Nanjing Road No. 1 is located at the intersection of Hong Kong Middle Road and Nanjing Road. It is a long -term idle core plot. This plot is surrounded by high -rise commercial buildings such as the surrounding Triumph Building and Sunshine Department Store. Golden treasure land. As early as 2005, it started here for a period of time, but the project stagnated after digging a large pit after digging a large pit, and stopped for many years. Because there was no drainage channel, it gradually became a large puddle. In 2009, the planning department at that time revealed that the No. 1 plot of Nanjing Road will plan and build a 42 -storey office and parking comprehensive building. The planning construction plan will be approved. Surprisingly, the planning will not change this "diamond diamond The fate of the plot has not been issued by the relevant departments. Until April 2013, the Qingdao Intermediate People's Court went to the former Qingdao Land Reserve Finance Center for investigation. The organizational center said that the land certificate of the land had been canceled. Since then, the plot has been briefly built in a simple house and attracted a lot of small catering companies, which has become a good place for working people in the surrounding office buildings to solve lunch. Subsequently, these simple houses were demolished and the block became a parking lot.
On the afternoon of the 29th, the reporter went to visit and found that No. 1 Nanjing Road was vacant, and some places were covered with dust nets. The plot was surrounded by the surrounding area. Only there was an iron gate beside Nanjing Road. Passing the phone through the iron door could clearly take the scene inside. "It is a pity that it has been so empty. After the transfer, the Dashui pit can also get a new life." Mr. Yang, who has been paying attention to his progress, said.
Last year, in order to achieve reasonable use of land intensive use, optimized the form of urban space, and promoted the improvement of the quality of the city, the Municipal Self -regulatory Bureau adjusted the nature of the land project 1 project of Nanjing Road and laid the foundation for its smooth transfer. Guanhai News/Qingdao Evening News reporter Xu Meizhong
- END -
[Popular Science Park] Prevention of diarrhea and traditional Chinese medicine treatment
After a hot summer period, it is now in the summer during the summer. Although the...
When will the live water park open to the outside world?The latest reply comes
Red Star News Network, July 12th. Recently, the question When will the renovation ...