Guangdong was selected as the first batch of provincial water network pilot zone in the country
Author:Yangcheng Evening News Yangche Time:2022.08.30
Text/Yangcheng Evening News all -media reporter Xu Zhangchao
Correspondent Yue Shuixuan
Figure/Guangdong Provincial Water Resources Department
On the 29th, the reporter learned from the Guangdong Provincial Department of Water Resources that the Ministry of Water Resources has recently determined that Guangdong, Zhejiang, Shandong, Jiangxi, Hubei, Liaoning, and Guangxi (autonomous regions) are the first batch of provincial water network pioneers to encourage 7 provinces (autonomous regions (autonomous regions ) Try it first, give full play to the leading role, and strive to achieve obvious results in the construction of the pilot zone for 3 to 5 years, creating a group of typical experiences that can be used for reference and promotion.
Guangdong is located in the lower reaches of the Pearl River Basin and the coast of the South China Sea. Major water conservancy projects such as the Pearl River Delta water resource allocation and the Guangdong water resources allocation of the Pearl River Delta are the important part of the national water network "outline, mesh" structure Essence However, Guangdong is still facing problems such as uneven distribution of water resources and contradictions between the total amount of water resources. Essence
Today, this has become a "key move" to solve the problem of water supply supply in Guangdong Province. Among them, Dongjiang, Xijiang, Beijiang, Hanjiang, and Jianjiang are "vertical". East -Shenzhen water supply and other projects are "horizontal", which will build a water network main skeleton and large arteries covering the 16 premium levels in the province with more than 76 million people in the province.
According to the relevant plan, the total investment of the "five vertical and five horizontal" water resources allocations is about 280 billion yuan, of which the plan is planned to complete more than 128 billion yuan during the "14th Five -Year Plan" period. After all completion, it can basically solve the problem of uneven distribution of water resources that has been troubled by Guangdong for a long time. It effectively responds to risks such as extreme drought events, salty tide on the dry period, and water pollution incidents. Water resources deployment ability.
The reporter learned that at present, 50 major projects of the 150 major water conservancy project construction projects identified by the State Council are currently incorporated into the State Council. There are 4 major projects. The development and reform commission is approved and planned to start construction on August 31;
East East Water Resources Optimization Projects, including 11 major water conservancy projects, have made significant preliminary work in the early stage. The water resource allocation project of the Pearl River Delta is nearing completion, and it is expected to achieve water through the end of 2023.
Source | Yangcheng Evening News • Yangcheng School
Responsible editor | Liang Zeming
School pair | Zhou Yong
- END -
[Health Hall] Broadcasting "Unblocked the whole body with the vine" at 17:25 today
expertLu Peiwen: National famous Chinese medicine medicineFu Na: Lu Peiwen, deputy...
The United Front Work Department of the Ganzhou Municipal Party Committee came to Hongxiang Tongxin to study and study, and unanimously praised a group of public welfare
On the morning of July 19, 2022, Han Fengfeng, vice chairman of the Ganzhou CPPCC,...