Comprehensive construction is completed!The first educational PPP project of China Construction Eighth Bureau debut

Author:China Construction Eighth Bure Time:2022.06.19

recently

The first educational PPP project of China Construction Eighth Bureau

Qingdao Blue Economics Vocational and Technical College

And five high school leasing talent apartments PPP projects

The last single single successfully passed the completion acceptance

It marks the complete construction of the project

The project is invested, constructed and operated by China Construction Eighth Bureau

Overall cooperation period 10 years

For the key construction project of Qingdao City

The first PPP project of Qingdao Education System

Total construction area of ​​285,000 square meters

Including Qingdao Blue Economics Vocational and Technical College

Two parts of five high school leased talent apartments

The project is the first theme of the country with the theme of the marine economy

Regional Development Strategy Zone -the Blue Economic Zone of Shandong Peninsula

After being put into use

It can solve the process of Qingdao's high -skilled talent training process

The problem of insufficient supporting facilities

Effectively alleviate the development of the economic zone

Education and training of high -skilled talents in marine majors

To meet the needs of school education and teaching

Create a healthy, safe, comfortable and beautiful learning environment for teachers and students

The project department passes through strict control of the project quality

Project progress and equipment equipment

The trunk, branches and cables were constructed according to local conditions

Three -level coupling underground comprehensive pipe gallery system

Drink water for the living of the park, water for fire, and direct water

The safe and efficient operation of the optical cable and other systems provides guarantee

Ensure that the project construction goal of "build one, excellent one"

The foundation of the academic exchange center adopts the jumping method for construction

Avoid pouring the belt after the reservation

Therefore, it greatly realizes the convenience of construction and accelerate the progress of construction

The goal of reducing construction costs and improving construction quality

The project will be independently operated by the China Construction Eighth Bureau

The service scope includes Qingdao Engineering Vocational College

730 -lease talent apartments, including five high schools

Daily property operation management

And supermarket shops, gymnasiums (swimming pools)

Supporting facilities such as hotels and other supporting facilities

Provide a comprehensive guarantee for the school's teachers and students

A big picture of Meitu strikes

Tiejun invites you to see the beauty of the "Jian" campus

Overlook

The whole school is at a glance

The laughter from the distance

It is the expectations of teachers and students for the new campus

Blue sky is clear

Baiyun Piaolia

The entire vocational school is like a paradise

Located on the banks of the seaside

Dawn sunshine sprinkle on the golden teaching floor

Langlang's book comes

That's the morning reading in the morning for the rise of China

Hillside of the lake

Is the memory of the campus years

Future generation student

Will go through their "Kangqiao"

- END -

The flood of the Yingde Water Disaster in Guangdong has passed, official: No casualties report

According to the People's Daily, at 10 o'clock on June 21, the three prevention he...

Henan Zhoukou: Safe travel starts from "head"

Zhoukou Daily · Zhou Dao client reporter Chen Yongtuan text/pictureIn order to ef...